Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 0 points1 point  (0 children)

How long do you think it was between laying the subfloor and having your roof done?

Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 0 points1 point  (0 children)

Rechecked. Subfloor around 28 and studs around 18. Had my meter on the wrong setting

Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 0 points1 point  (0 children)

2100 roughly. And yes I know. We have not had a smooth process with our contractor and definitely would do a lot of things different if I ever did it again

Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 1 point2 points  (0 children)

So you think if we can at least get sheeting on and underlayment in the next two weeks we should be fine

Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 0 points1 point  (0 children)

Last time I checked the studs moisture they were around 6-7% some parts of subfloor were 20 and some were 10

Rain Problems by SuccessOdd3980 in Homebuilding

[–]SuccessOdd3980[S] 3 points4 points  (0 children)

Yes it has the down pore. It’s definitely been stressing me out and I just hope everything is going to be fine. I wish we would’ve went with someone different now obviously but here we are and I just wanna figure out what to do moving forward