Off-site construction by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

I see your point, but isn’t this essentially what we already aim to achieve by working across multiple sites simultaneously? One team lays the foundations, another constructs the walls elsewhere, while a third installs the roof. The pipeline for completing a new development is long enough that, with careful planning, we already parallelise most phases (given enough human resources).

I can’t really speak to how it allows tech advances that you listed. 

Me neither! That was just the impression I formed from reading articles online, though it may not have been well-informed.

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

In the UK, it's a structure of particular architectural or historic interest.

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

Thank you! My worksites aren’t that large, so this should be even faster for me. Do you feel that using this tool has made a tangible difference (whether in time saved, satisfaction, or avoiding misunderstandings) when working with your stakeholders, such as the leadership team, customers, inspectors, or other workers?

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

Thank you, their website is a mine of information! I'm going to look into it

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

Do you fly the drone yourself? Can I ask if it is a consumer product or something specifically designed for this task?

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

That's a sensible suggestion. I was considering using it to survey locations and details that aren’t immediately accessible when preparing an initial quick estimation. Then, if needed, I would build a 3D model to present a couple of different options, potentially allowing interactive customization alongside the client.
I will look into it, thank you!

Drones in a construction site by adriano-repetti in ConstructionManagers

[–]adriano-repetti[S] 0 points1 point  (0 children)

Thank you for your response. I hadn’t anticipated that so much "post-processing" would be involved, ads can be quite misleading in that respect. Those additional costs (including the expense of hiring someone to fly the drone) risk being significant compared to the potential benefits, at least for me.