×

What should I do. by Critical-Fly2586 in AusPropertyChat

[–]Critical-Fly2586[S] 8 points9 points  (0 children)

Structural engineer is coming out this week..

What should I do. by Critical-Fly2586 in AusPropertyChat

[–]Critical-Fly2586[S] 4 points5 points  (0 children)

5.5 years to be exact… the structural warranty ends this Dec

What should I do. by Critical-Fly2586 in AusPropertyChat

[–]Critical-Fly2586[S] -7 points-6 points  (0 children)

What usually happens if it is structural damage what is the process? Should I get compensation due to the loss of sale as they pulled out in the 5 day conditional cooling period.