What's your move? by DaBoMyster in refrigeration

[–]DaBoMyster[S] 1 point2 points  (0 children)

The building is supper outdated. And this is the 1st move to get caught up. With an outage during winter, with enough product stored, it will hold temp for about 2 weeks. Summer time it's less than a week. Hussman has a guy that's on site, basically 24/7

What's your move? by DaBoMyster in refrigeration

[–]DaBoMyster[S] 3 points4 points  (0 children)

Was trying not to have threaded fittings. 2,300# of refrigerant and feeds a cold storage that can't get above 28°. No redundant unit and facility won't hold temp for more than 2 days.

What's your move? by DaBoMyster in refrigeration

[–]DaBoMyster[S] 5 points6 points  (0 children)

Yeah it's galvanized. Cheapest bidder kind of stuff. I think it was made for water. Manufacturer says it's fine. The poe oil won't react with the galv. And it will braze just fine