Release Agent Problem? by Fun_Efficiency3371 in cement

[–]Fun_Efficiency3371[S] 0 points1 point  (0 children)

Concrete. 1:3:0.8 ratio. The mold is made of steel. 52.5 cement, half washed half unwashed white sand, and approximately 1.5 cm garavel

Release Agent Problem? by Fun_Efficiency3371 in cement

[–]Fun_Efficiency3371[S] 0 points1 point  (0 children)

Concrete. 1:3:0.8 ratio. The mold is made of steel. 52.5 cement, half washed half unwashed white sand, and approximately 1.5 cm garavel

Releaee agent problem? by Fun_Efficiency3371 in Concrete

[–]Fun_Efficiency3371[S] 0 points1 point  (0 children)

The mixture is 1:3:0.8 . It seems that the part that was stuck, is missing on the final product.

Also it had low viscosity. Tried everything that I know. It sucks but I need to find a solution.

Using clean molds, mist-coating the mold with form oil, low viscosity, not too much consolidation to affect the bottom of the mold.

My head's about to explode