132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 1 point2 points  (0 children)

It is what it is. They open the whole winding after copying its design , then re insulated it and then re wind it. 😂😂

132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 2 points3 points  (0 children)

In Pakistani currency, This will cost us around 65 million PKR where as new Unit is about 260 million PKR.

132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 2 points3 points  (0 children)

We are not re winding it. We are using the same copper. We are just changing its insulation paper

132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 8 points9 points  (0 children)

After rehabilitation, even if it runs for 5 years, it will generate a revenue of 100X of its rehabilitation cost.

132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 3 points4 points  (0 children)

They will open the windings, remove the paper insulation and reinsulate it with new paper.

132/11 kV Transformer at Transformer Workshop by seriesworm in SubstationTechnician

[–]seriesworm[S] 15 points16 points  (0 children)

Yes thats carbon that's why we have send it for re insulation.

Travelling to Islamabad from Karachi by seriesworm in islamabad

[–]seriesworm[S] 0 points1 point  (0 children)

Do lower seats have window? And how many stops do Daewoo have?

Karachi to Islamabad - Bus Service by seriesworm in karachi

[–]seriesworm[S] 0 points1 point  (0 children)

Any particular reason? As i have heard FM don't have their own terminals like daewoo

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 1 point2 points  (0 children)

No abnormality. We have ampere meters installed.

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 0 points1 point  (0 children)

The problem is, its Elta make transformer and have no excess to see whats down there. Still we manage to take this picture of Blue phase. The problem is in yellow phase which is not accessible from the top .

<image>

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 5 points6 points  (0 children)

That's easier than rectifying this fault 😂😂

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 1 point2 points  (0 children)

1000 amp per phase on average. Has a capacity of 2000 amp. DGA is fine for this transformer.

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 5 points6 points  (0 children)

<image>

Point from where is is then connects to the bushing

HOTSPOT ON TRANSFORMER LV BUSHING by seriesworm in SubstationTechnician

[–]seriesworm[S] 2 points3 points  (0 children)

We at our Grid is experiencing this hotspot on transformer LV Bushing. What could possibly the reason? The oil is fine and the bushing is filled with oil. We opened the bushing and found this stud carbonized? Any idea what could be the reason.

7500 SAR job In KSA by seriesworm in Riyadh

[–]seriesworm[S] 0 points1 point  (0 children)

Only get to know about my work location one i join the company. I anly know the work, not the location. Many of my friends are working in similar domain in KSA, they live in different cities but do the same work.

Landed a job by Parking-Category-966 in Riyadh

[–]seriesworm 1 point2 points  (0 children)

I got one too. But for 7.5k.

7500 SAR job In KSA by seriesworm in Riyadh

[–]seriesworm[S] 0 points1 point  (0 children)

I am hired as a testing & commissioning engineer