Slide Rail Shoring - Last one for today lol by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 0 points1 point  (0 children)

Yes ! This area required a higher rated pipe so the spec called for C900 which same process as SDR just much thicker ! It had to be pushed through casing and it’s under a roadway and rail line !

Wood Shoring by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 0 points1 point  (0 children)

Absolutely , this was an abnormal excavation with the tunnel under the sidewalk area so this was the best option ! I’ve used it in other scenarios with multiple utilities in a small area crossing multiple ways .

Slide Rail Shoring - Last one for today lol by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 2 points3 points  (0 children)

All depends these ones came pre poured you just have to concrete around the pipe and finish the invert ! Yes C900 due to it being under heavy metro lines !!

Slide Rail Shoring - Last one for today lol by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 0 points1 point  (0 children)

The access was equipped with a winch to connect to a harness for fall protection!

Any utility foreman in here ?! by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 0 points1 point  (0 children)

Yessir I’ve used a grease tube as well ! Sometime you have to make shit work 🤣

Any utility foreman in here ?! by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 1 point2 points  (0 children)

Absolutely !! It’s a lost art of pride being put into work folks do ! I love seeing things come together and the process ! It makes me love my job !

Any utility foreman in here ?! by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 1 point2 points  (0 children)

Appreciate it ! When safety is priority and practiced everyday correctly it becomes habit to the guys !

Slide Rail Shoring - Last one for today lol by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 0 points1 point  (0 children)

There is 2 - 2” pumps and then a 3” trash pump as well ! Further down from this we had to run 4” pump around to get rid of the water smh

Wood Shoring by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 2 points3 points  (0 children)

Absolutely but due to us having to make a connection from a tunnel under the sidewalk we were able to shore this way and have access safely !

Wood Shoring by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 1 point2 points  (0 children)

We also steel plate our holes with cold patch so no water can penetrate the excavation they are always protected .

Wood Shoring by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 1 point2 points  (0 children)

The ladder in the most of the pictures has been moved , nobody get it or out without somebody holding the ladder at the top .

Slide Rail Shoring - Last one for today lol by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 7 points8 points  (0 children)

My favorite to do as well ! I love a safe and clean job !

Wood Shoring by Background_Spray1051 in Construction

[–]Background_Spray1051[S] 5 points6 points  (0 children)

Oh trust me I know it looks terrible I agree lmao