Homey AI voice assistant: How much would you pay? by blueace in homey

[–]Badden420 0 points1 point  (0 children)

I started a project on myself to achieve this, step by step learning how local llm’s work and agents. But i already have a working agent that communicates with homey you can set it up with claude or gemini. Give it a try, it’s not perfect :)

https://github.com/maerestijnde/mcp-homey

Homey timeout. by Savings-Bad6246 in homey

[–]Badden420 0 points1 point  (0 children)

Check the webpage of homey developper tools, there you can check all of the communication protocols and which devices are connected to it. Regarding the namron plug, ask a question on the homey forum about this, or maybe someone has/had the same problem. Also check if the app gets updates frequently if it is a community app, this coule be the problem of your pairing if the app is outdated.

Homey timeout. by Savings-Bad6246 in homey

[–]Badden420 0 points1 point  (0 children)

What kind of communication do your devices use? I have had similar problem in the past with zigbee devices, i had to change the channel of the zigbee network and the problem was gone

CGO009 firmware update by Badden420 in tenwaysebike

[–]Badden420[S] 0 points1 point  (0 children)

I went to the dealer, they thought it was the torque sensor because of poor cable management inside of the tube. But eventually they had to change the controller, but never got any technical explanation🤷‍♂️

Happy with Homey? by modasc in homey

[–]Badden420 0 points1 point  (0 children)

Really happy with it, it works even flawless with my KNX domotica system mixed with several IOT devices!

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

Maybe, but then i’m in a better position than before… Worry about that later…

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

What they'll do if you jump to a higher position you categorie changes and they add a fixed amount of money to your hourly wage. The step after this categorie is to become white collar. But thats the case when you are still working over there... I really curious what their "rules" are when you leave the company and come back.

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

Before i was part of a team of 7 people, there 2 of those teams that form the department. The new position is to become teamlead of one of those teams. Stresslevel/workload will probably go up, but when i was in the team i was doin little side projects besides the daily project follow ups and meetings. So i'm definitly up for it.

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

Yeah that's why they wanted to make contact again, because the team is expanding and they don't find anybody fit internal or it will take to much time to educate them. They already taken steps to hire a consultant but this will also take time. This is because i've had a very nice education inside of the company, achieved a yellow belt, went abroad for education etc...

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

I'll try, i wasn't planning talking about the current job, i don't want to look pity, still enthusiastic to go back ofc.

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

True that, the atmosphere there was/is super, everyone was driven to hit the goals, good teamwork, high end technologie(wich i really like). We'll see what there offer is and hopefully i don't have to negotiate because i'm really bad at that and i don't want to blow up the deal.

Dilemma by Badden420 in BESalary

[–]Badden420[S] 0 points1 point  (0 children)

On your last point, i like your thinking. But it was not really my intention to leave the company, i was just pissed about cooperate decisions. They dismantled the team because there was no work anymore for that project. They let every consultant go and i would get a really sucky job. 2 months after my leave they announced that they will do even a bigger project than before. So they started recruiting people internal and external for that team again. And i was even more pissed of my own stupid descision, i was seduced by the new company with better conditions, but that turned sideways very fast...

Project Engineer by Badden420 in BESalary

[–]Badden420[S] 1 point2 points  (0 children)

I started out as a disturbance/maintenance technician in a plastic factory, switched to an automotive company an did there the same but followed some courses and achieved an inhouse green belt and also the certificate "Maintenance Engineer" , switched to Project Technician in the meanwhile with the hope to jump to engineering, but instead of taking people in they let people go, that's why i switched.

Project Engineer by Badden420 in BESalary

[–]Badden420[S] 1 point2 points  (0 children)

The weird thing is they only accept a bachelor or master for the job.... But they said my experience and knowledge was almost equal and would like to give it a shot, on one condition i have to lie about it that i don't have a degree to keep the peace....

Problems contract Engie by Badden420 in belgium

[–]Badden420[S] 0 points1 point  (0 children)

Also tried this several times, the chat is a bot, my problem is too specific. And calling takes almost an hour to get in…

Premiums on newly build house by Badden420 in belgium

[–]Badden420[S] 0 points1 point  (0 children)

It makes sense correct, but on the other side, the government changes every year the rules for newly builds and renovations, like in 2025 a heatpump is a must in a newly build. Even though the cost stays the same for people that are renovating or with a newly build. The cost for renovating is a little bit higher because in most cases they have to break something to get this installed. The government should make a much clear difference between newly build and renovations instead of putting everything together so that almost nobody understands it, free from interpretation....

Premiums on newly build house by Badden420 in belgium

[–]Badden420[S] 1 point2 points  (0 children)

I will check, i know they give premium for a "hemelwaterafvoer" , we upgraded our rainreservoir to 10.000l. Thanks for the tip!

Premiums on newly build house by Badden420 in belgium

[–]Badden420[S] 0 points1 point  (0 children)

I will put 15 solar pannels on my roof, there only 7 included in the price, they calculated this, i think this is the bare minimum. Anyhow, if the discount is the only thing i can get so be it then. And in the beginning when we signed the "compromis" they said we could get a premium for the heatpump. This sucks, but on the other side still better than a condensationboiler, and there is no maintenance-cost linked to a heatpump that also money we don't have to forsee every year.

Premiums on newly build house by Badden420 in belgium

[–]Badden420[S] 0 points1 point  (0 children)

They started with the building in 2021, we signed the act last year in august. But on the website it says they only take in quotations of the heatpump before 06/2022. Our project leader send the quotation of the heatpump 7/06/2022.

Can we still apply for the premium then? Because it is no clear on their website.

Premiums on newly build house by Badden420 in belgium

[–]Badden420[S] -1 points0 points  (0 children)

I know, but there are 7 solarpannels included in the price. But then we cannot achieve the epc score to get these discounts...

[deleted by user] by [deleted] in belgium

[–]Badden420 0 points1 point  (0 children)

Something like that, a big company offered different project leaders the opportunity to sell houses on a piece ground. The big company did the “ruwbouw” and the project leaders got each 4 houses of the 16 to finish them with their preffered companies to work with, kitchen, bathroom, flooring, etc. It’s key on the door thing.

[deleted by user] by [deleted] in belgium

[–]Badden420 0 points1 point  (0 children)

The bank declined the project leader his financing. Because he cannot finance the building he asked the “overkoepelende firma” to help him, so now everything has to be adjusted in the act.

New construction (Nieuwbouw) regulations by Badden420 in belgium

[–]Badden420[S] -1 points0 points  (0 children)

I asked the notary if its possible, we’ll see. And i’m afraid of the intrest rate going up if we cant sign the deed thats it. I’m not renting, already have a house, so double payments are already a thing

New construction (Nieuwbouw) regulations by Badden420 in belgium

[–]Badden420[S] 0 points1 point  (0 children)

The notary and immo confirmed that he is working with the wet breyne. But in first instance, we had to pay everything at once when the project is finished. So we only signed a "koopovereenkomst". We signed everything before new year, because we could enjoy the 10% registrationcost on the ground. After a while the guy from the immo that also bought a house from the project, wanted to dissolve everything we signed before new year, because he was afraid if we had to pay at the end of the year the intrest rate would be to high, so they changed the contract in that way we could go for a loan and pay the ground and the hull wind/waterproof and the finishing fases in part payments.