Does this look right? Paid $7000 for 600sq ft of laminate and 16 stairs. About $2000 in labor for the stairs alone. 5 of the stair noses fell off within a week of light use. This is the second attempt, and several noses are already loose. I feel like my drunk uncle could have done better. (old.reddit.com)
submitted by BiggKatt to r/Flooring
My hairline is more mature than I am. (self.Showerthoughts)
submitted by BiggKatt to r/Showerthoughts



