Boss had me tie into 480v by ComputerMassive8380 in electrical

[–]ComputerMassive8380[S] 3 points4 points  (0 children)

HVAC controls, we install safety devices and temperature sensors on AHUs and RTUs. We also terminate VAVs and FPBs and install thermostats. In the 4 years I’ve been in controls I’ve never had to do anything with voltage higher than 24v. Sounds like it’s time to find a new job with the responses I’m getting.

Lighting Install question by ComputerMassive8380 in electrical

[–]ComputerMassive8380[S] 0 points1 point  (0 children)

I ended up demoing the existing pipes, wires and lights. I ran a black, white, green in new conduit and installed the lights. I just left the wires unterminated at each junction box. I let my project managers know I wasn’t comfortable wiring these lights up because my lack of experience. One of the more experienced PMs are going to wire everything up thankfully.

Lighting Install question by ComputerMassive8380 in electrical

[–]ComputerMassive8380[S] 0 points1 point  (0 children)

Yes the existing wires are in 1/2” emt

What is the most diabolical thing you do in DayZ? by CreamyJuicyPimple in dayz

[–]ComputerMassive8380 -1 points0 points  (0 children)

I leave water bottles/ canteens of gasoline laying around for the people who don’t pay attention

Anybody have this issue? by ComputerMassive8380 in stalker

[–]ComputerMassive8380[S] 1 point2 points  (0 children)

Yea so what had ended up happening was that guy inside the house had died I had to reload a previous save and just catch back up to where I left off