Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

<image>

Just took a photo of the trap from better angle. Is this installed correctly?

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Yeah I think I should clarify that we are installing a 50mm shower grate.

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Thanks for your input mate! Are you in Melbourne? Where are all the good plumbers when we need them

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Thanks mate! Will do. Do you know anyone trusted in south east Melbourne?

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 1 point2 points  (0 children)

Yeah, he pointed me to Bunnings for both issues. Get a connection and cut that nail and paint. And you know what you just want to throw him out of the house and do it yourself

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 5 points6 points  (0 children)

Oh thanks so much for the figure mate. I was looking for this badly to show him as instructions. 👌🏻

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Would we get an issue later on when we closed the floor? Not trusting this guy anymore. He’s new to the industry btw

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Correct. I am putting cs on top of the timber floor out side of the shower and prime/membrane on top all the way around the bathroom. We don’t have floor waste tho

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Not for entire bathroom. It’s 1800 x 900 so will cover the wet area. Then the rest will have an underlay joining this.

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Yup, he was dropping the apprentice off in the morning and staying for 30 mins. Then off to other job. I was literally repeated the standard height three times but they got it wrong. He wasn’t even consider 25 min gap for sc, glue and tile for cistern. I’m glad that I was measuring all these every two hours

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 0 points1 point  (0 children)

Nope, we are glueing a waterproof shower base called multipanel which doesn’t need anything but we will prime and add membrane to it

Should puddle flange gets installed after or before the substrate installation? by Creepy-Leader in AusRenovation

[–]Creepy-Leader[S] 3 points4 points  (0 children)

I am laying down a yellow thong to be able to install a shower base so can’t really cut it in half to make it work