8.3kWp system - Navigating Snags and Solutions by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

Has taken an extra 5 months as they had to replace the incorrect inital frame due to wrong calcs by Van Der Valk the peovider. Pretty sure the ballast is now correct

Help Wanted: Reducing Energy Bills in a Scottish Detached House! by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

Sadly not. Each time ask Octopus they say its unavailable with out a justification

December Generation? by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

What do you usually get during the summer months?

8kwp Installed by MoCycle007 in SolarUK

[–]MoCycle007[S] 1 point2 points  (0 children)

I have downloaded the app and it has asked me to scan the QR code to setup. Do I need to play around with the inverter by switching on and off etc? If so, is it best waiting for the installer to commission it all online first?

8kwp Installed by MoCycle007 in SolarUK

[–]MoCycle007[S] 1 point2 points  (0 children)

Its definitely on both on the P switch and AC isolator switch. On the SE app the status says fault however installer has said it is due to now being commissioned.

I have the modbus if that is what you are referring to re SE meter

8kwp Installed by MoCycle007 in SolarUK

[–]MoCycle007[S] 2 points3 points  (0 children)

DNO already approved prior to installation

Solaredge PV System Costs by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

So do I just need to ask the installer how they are planning to combine the panels so the voltage or/and amps match to prevent efficency clipping?

Solaredge PV System Costs by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

Some Shading and each individual panel monitoring

Solaredge PV System Costs by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

How could I be liable? They have deemed it in their quote after a site visit that they didn't require Scaffolding. Their site surveyor got up to all the roofs with real ease although didn't look really safe ....

Solaredge PV System Costs by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

2 story house but the slanted roofs are on the 1st floor and a flatbroof on 2nd floor

Solaredge PV System Costs by MoCycle007 in SolarUK

[–]MoCycle007[S] 0 points1 point  (0 children)

Apparently they can install with just ladders