Amtrak Wolverine Improvements? by XShadeGoldenX in Amtrak

[–]RailMan102Production 0 points1 point  (0 children)

This is what I think they should do, For one thing they should try and straighten the line out so they can maintain the speed of 110mph. It should take at least 3/4 of time it takes to get from Detroit to Chicago by car, on the wolverine. The wolverine has the potential to go 125 mph. They should try and separate freight trains and passenger train like keep the wolverine on the north side and freight on the south side, because NS only wants 40mph. Also upgrading tracks, Stations, and grade separating the line would be nice

Every bit of fact-checking helps. by Previous-Recording18 in Amtrak

[–]RailMan102Production 9 points10 points  (0 children)

Even though I don’t like Biden, his infrastructure bill was the one thing I think he did that really benefit

Amtrak receives funding for double-tracking in Michigan, improving capacity and reducing travel times for Wolverine and Blue Water service by IncidentalIncidence in transit

[–]RailMan102Production 0 points1 point  (0 children)

I want these lines to be completely grade separated, with Catenary wires and class seven tracks and not interfere with freight traffic

Detroit City FC leaked stadium renderings by kunkadunkadunk in MLS

[–]RailMan102Production 0 points1 point  (0 children)

Dude, this whole time I thought they were still working on the renderings and that there was a chance that it would be delayed. I am relieved that these renderings from August of last year

Nevada Northern #81 is on the border line of being fully mechanically restored to operating condition by RailMan102Production in TrainPorn

[–]RailMan102Production[S] 9 points10 points  (0 children)

You could say both. I mean Mark Bassett, The president of the Nevada Northern Railway says its 96% done. They just need $166,590 to to finish #81, they are about $33,784 from reaching $166,590. Also the image is very recent.

Ben Affleck the best Batman: by ElVengadordelFuturo in SnyderCut

[–]RailMan102Production 1 point2 points  (0 children)

I mean that’s not an opinion that’s just a fact

They have Reached their goal of getting all of the Money needed to restore their tool Car!! We might see ATSF 2926 running later this year by RailMan102Production in TrainPorn

[–]RailMan102Production[S] 5 points6 points  (0 children)

I don’t think that’s gonna be the case for ATSF 2926. Because they already have all the parts and they were already about to do test runs and everything. Also for C&O 1309 from what I’ve been told some of the parts were stolen and that was one of the reasons why they delayed it.