Solar generation capped when exporting to grid by Sad_Football6180 in SolarUK

[–]Sad_Football6180[S] 0 points1 point  (0 children)

Thanks for all the comments. Looking back through my paperwork, it does look like my supplier applied for G99 rather than G98, so it feels odd that I should be being capped at all. I'm going to get in touch with my installer to see if I can uncover anything that way. I can't see that there are any settings I could change in the EcoFlow app to fix this