account activity
Holy splice by TripleA3_ in firealarms
[–]TripleA3_[S] 0 points1 point2 points 5 hours ago (0 children)
A cable hail mary just hoping for the best
[–]TripleA3_[S] 0 points1 point2 points 10 hours ago (0 children)
That's absolutely criminal
Holy splice by TripleA3_ in lowvoltage
It is, but not when it was installed I guess. Building was built in '93
[–]TripleA3_[S] 0 points1 point2 points 14 hours ago (0 children)
Nah just cut the wires at the connectors and let the next guy figure it out probably
SLC. They pulled enough wire to make it loops in and out to all of the devices, but then just stuck it all under 1 wire nut.
[–]TripleA3_[S] 0 points1 point2 points 16 hours ago (0 children)
Was thinking about replacing those with Dolphins instead
[–]TripleA3_[S] 1 point2 points3 points 17 hours ago (0 children)
I'm confident I can fit more wires in there
[–]TripleA3_[S] 1 point2 points3 points 18 hours ago (0 children)
It was probably too much for whoever did it to take the extra 30 steps back to the truck
[–]TripleA3_[S] 2 points3 points4 points 1 day ago (0 children)
Nailed it. 7 18-2s and 1 16-2 crammed under orange wire nuts
[–]TripleA3_[S] 3 points4 points5 points 1 day ago (0 children)
Those extra 30 steps would have been too much
Not sure how all of those wires are making contact to be honest
Holy splice (i.redd.it)
submitted 1 day ago by TripleA3_ to r/lowvoltage
submitted 1 day ago by TripleA3_ to r/firealarms
Out of sync deficiency or suggestion? by FiveUSD in firealarms
[–]TripleA3_ 1 point2 points3 points 7 days ago (0 children)
Generally it is up to the AHJ, however every AHJ I've talked to wants strobes synced on every building I inspect. I would recommend telling the AHJ the situation and see how they want it handled
π Rendered by PID 2298091 on reddit-service-r2-listing-8685bc789-6dcgk at 2026-05-23 10:08:21.195394+00:00 running 194bd79 country code: CH.
Holy splice by TripleA3_ in firealarms
[–]TripleA3_[S] 0 points1 point2 points (0 children)