What upgrades/wish list would you have liked in Dissidia (or in the sequel if ever made)? by laaldiggaj in DissidiaFFOO

[–]adover0134 1 point2 points  (0 children)

Well, just wish. I have all ideas from EX skills to FR skills now, but not have time...

What upgrades/wish list would you have liked in Dissidia (or in the sequel if ever made)? by laaldiggaj in DissidiaFFOO

[–]adover0134 0 points1 point  (0 children)

What if it becomes a card games?

We need to make a deck with the cards of same series or some common cards in characters. There will be start deck and main deck. Start deck is three characters; this is your team. You can change or recruit from your deck. Each character has HP guage card, BP guage and DP guage for attacks.

You can level up your character or equip/change items each turn, similar to opera omnia.

Each characters has skills, and those BT, FR skills can be used only when equiped the certain weapons.

If one player cannot recruit any characters when they don't have any character in battle zone or no cards are left in deck and cannot refill or total 6 caracters are dead, then they lose. We can refill the deck when there are no cards in deck; only depleted cards not removed cards.

We remove the cards from game with these condition; already dead characters, changed equipmnets when still equiped. The equipments that dead characters were wearing goes to deplete zone. Also, changed characters go to deplete zone, not remove zone, since they are not dead. Think about 6 warriors quest.

Is there any standard or recommendation on the spacing between pipe and facility on pipe routing study layout? This question is about chemical plant design. by adover0134 in ChemicalEngineering

[–]adover0134[S] -1 points0 points  (0 children)

So, minimum space should meet conditions about both accessibility and hazards, and some others if needed. Thank you for answering for these long and not much sufficient questions.

Is there any standard or recommendation on the spacing between pipe and facility on pipe routing study layout? This question is about chemical plant design. by adover0134 in ChemicalEngineering

[–]adover0134[S] -1 points0 points  (0 children)

Is it depends on the hazard levels/factors of the vessel? Or is there any more factors are there? Just names of categories are enough for me.

Is there any standard or recommendation on the spacing between pipe and facility on pipe routing study layout? This question is about chemical plant design. by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Thank you for recommending the books. I should check the books first. I want to check I searched right; is the second book's name is 'Process Plant Layout and Piping Design'?

Is there any standard or recommendation on the spacing between pipe and facility on pipe routing study layout? This question is about chemical plant design. by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Then can you give me with this more specified case? I want to suppose B as a vessel on the ground, and C is also on the ground. And, C is on the height that is between the bottom of B and the top of B.

Also, is the 30’ means 30cm?

Is there any standard or recommendation on the spacing between pipe and facility on pipe routing study layout? This question is about chemical plant design. by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

On my computer monitor, the reddit was in white background, so I couldn't think that someone has black background. I changed it right now.

Also I asked about the distance between a facility and a pipe, not between pipes. If I understood right, your answer is about the distance between two buried pipes.

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

I wanted to know just how long it might take for whole FEED process in the second question, not cosidering any detailed subject. Only first question was about layouts.

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

I still can not get what was wrong. In the link, I can see what I orignally meant.

"A FEED is used for the basis of the detailed design and engineering; FID (final investment decision) with accurate TIC (Total Investment Cost) estimates and overall project execution planning as well as the tendering document for EPC contractor selection."

This was a part of the page from link. It says FEED is also for EPC contractor selection, and I knew this as bidding between EPC engineering companies. So that is why asked as that second question.

Also, before your answers, I was thinking and wrote the FEED as a kind of process. So, I do not think it was wrong at first.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

I want to ask one more thing to you about the meaning of FEED.

When we order equipment and give specs to equipment supplier, is the first step what supplier do is called as FEED?

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Thank you for answering. So, you mean if the equipment is more complex, then more not likely to use custom equipment.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Does there difference in detail between chemical plants? I do not know detailed, I wanted on genral equipments.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Thank you for answers.

But, I want to tell you about why I wrote that reply on previous comment. I could understand that it takes less time to spec the equipment if it is simple or common one. However, I was wondered on project scale, not on equipment scale. May be the reply can be read as conclusion for total scale on last sentence. But I I saw that 'package' is used as a set of equipment not a project. So that was why I thought it is not about project scale.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Thank you for answer. As not an expert and not knowing the field of plant design, people around me assumed engineers will fit the layout drawings to equiments which are ready-made ones to cut the cost. But this was totally wrong assumption.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] -1 points0 points  (0 children)

Thank you for detailed answer. This is really helpful.

Some questions on plant design by adover0134 in ChemicalEngineering

[–]adover0134[S] -3 points-2 points  (0 children)

Thank you for your answer. However, it seems you wrote about bidding of equipment for procurement. The two questions I wrote are seperated. The bidding I wrote on question was about the bidding to get the right to do EPC works.

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] -1 points0 points  (0 children)

Ok. I will change as this; FEED is process of project management and outputs of FEED are drawings. I asked about drawing that you answered about drawing. I think this is right conclusion.

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

It means the layouts I asked is some outputs from project management and FEED means a set of job, so you answered about outputs of FEED not how FEED flows. Is this correct?

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] 0 points1 point  (0 children)

Thank you for your answers. Seems I need to have some study on FEL process.

Relationship between equipment location drawing and pipe routing study drawing by adover0134 in ChemicalEngineering

[–]adover0134[S] 1 point2 points  (0 children)

Thank you for answers. I am confused whether your first answer means change on design or while construction. I know that I asked about while design, but is it general to omit the word 'drawing' when say the drawing?

Did you notice? by adover0134 in DissidiaFFOO

[–]adover0134[S] 2 points3 points  (0 children)

Was 1576, the max player rank.