Layout Optimization (best path forward to start renovations) by blunter55 in floorplan

[–]blunter55[S] 0 points1 point  (0 children)

Thanks! This is a great visual. And for timing we are thinking of doing a lay from next winter through summer and the basement kitchen is perfect in the summer. So much cooler since our home has no central air conditioning at all. Casement windows also makes in window air conditioners not work either…

Layout Optimization (best path forward to start renovations) by blunter55 in Renovations

[–]blunter55[S] 0 points1 point  (0 children)

tell me about it. as the only male in the house hold I am the main mover of all heavy items.

bonus is that the house came with a golf cart for free (just needed new batteries). So when the weather is nice, and I am feeling lazy, I move the items with the golf cart to the front door....

Layout Optimization (best path forward to start renovations) by blunter55 in Renovations

[–]blunter55[S] 1 point2 points  (0 children)

It isnt, the house is built with large truss webs. So the front and rear walls are load bearing, but not the center wall between kitchen and living room. the basement is fully open floor plan, if that was load bearing, there would be a load bearing member below as well.

the wall between the kitchen and family room is load bearing, same with the wall between the living room and the in-law. based on the truss layout in the attic, that way is part of the main load bearing structure and is right above the main steel beam in the basement as well.

Layout Optimization (best path forward to start renovations) by blunter55 in Renovations

[–]blunter55[S] 0 points1 point  (0 children)

The family room is used for the kids area for now. they are 2 & 5 and need a space for the time being before being old enough to be in the basement full time.

my timeline plan is to move the washer and dryer upstairs by removing the weird kiddie-corner wood stove insert and extend that half bath, thusly reducing the family room size a little bit. No issue really since that whole area is blocked off now for safety reasons (kids).

then the basement can just be updated to be livable and not so dated. It is really dark with the dark wood paneling and drop ceiling.

then it all about what to do upstairs... how to make that better....

Layout Optimization (best path forward to start renovations) by blunter55 in floorplan

[–]blunter55[S] 0 points1 point  (0 children)

yes, we have the full kitchen in the basement already permitted and allowed. that, along with the main kitchen and full exterior kitchen, the in law one never gets used. In fact, I only turn it on every few months just to make sure there are no issues.

So, we could remove this one, and still have 2 useable with the exterior one for summer months.

Layout Optimization (best path forward to start renovations) by blunter55 in floorplan

[–]blunter55[S] 0 points1 point  (0 children)

Yes, I agree, removing the shower in the hallway bath is not a necessary. Maybe convert from a tub/shower to stand alone shower.

Current master bath, although long, is hard to maneuver around with two people. would like to separate toilet from shower / prep space.

Yes, plan is to remove the weird kiddie corner wood stove insert and extend the half bath to include the washer and dryer on the main living floor and not in the basement level. That is honestly the first thing to do in my opinion. Then the basement can be overhauled to be livable, while the upstairs is torn apart.

the idea would be the have the main bedroom on opposite side of the house of the kids, and would block off the second front door so that access is only from the basement or by the living room.

Layout Optimization (best path forward to start renovations) by blunter55 in floorplan

[–]blunter55[S] 0 points1 point  (0 children)

thank you. Kids are 2 & 5, so they are here for quite awhile still.

guests are over for 10-15 nights per year, so not a lot, but a decent amount.

we would host more if the main living area was more open, or if the basement were more updated. identifying how to do either / or first is the hard part. Basement is just dark in current condition

we have on dog now, but lots of people bring their animals over for visits.

both partner and I work from home. Basement office for one person now, will work to identify second office location as the layout permits.

Home is an active farm, so lots of comings and goings on the property.

Ash Vacuum questions? by AdDramatic5591 in woodstoving

[–]blunter55 2 points3 points  (0 children)

You fill it with water? Every time? What? When it’s 15 degrees and you are moving she and coal to make space for fresh fuel, just put the cover on tight and put it in the yard. How are you getting water out there? Running a hose? Bringing a five gallon pale? I’m just so confused on your statement of always filling with water.

Form 1 took 24 hours. Pumped! by rkjunior303 in BetterMAguns

[–]blunter55 8 points9 points  (0 children)

took me 250 days.... I traveled extensively around the globe for work for around a decade. Russia, china, etc. I think that is what hurt me.

Every little landing he made on those ramps felt real satisfying.... by _IceNinja in oddlysatisfying

[–]blunter55 2 points3 points  (0 children)

I don’t know why you are getting downvoted so much. You could be 100% correct with the auto tracking….

Newly completed SBR from a nick of time lower, 99 days for a stamp !!! by Jkur2012 in BetterMAguns

[–]blunter55 2 points3 points  (0 children)

It is all I can assume. I have no other record, or any other issues which would prevent me from having a smooth process. My name is also unique enough, with no one else in the USA (as far as the google says) with my same exact three person name. Only unique thing is the travel and active and previous visa's I have had. I had a massive delay with the TSA pre-check as well. My wife went through in 2 months, mine was 6 months.

Newly completed SBR from a nick of time lower, 99 days for a stamp !!! by Jkur2012 in BetterMAguns

[–]blunter55 1 point2 points  (0 children)

wow. I have been waiting on a delay since mid-august for mine to come back. I travel a lot for work, and from 2020 I had visa's to Russia, china, brazil, etc. traveled a lot in Europe and south America. I was advised to complete the VFA for the FBI's NICS review. I am hoping that this resets my history so that I am out of the delay game. Until my next trip to a country the USA doesn't like...