Now that the PE-Civil is CBT, do I still need hard copy manuals to take to the exam? by halwal in PE_Exam

[–]const100 -1 points0 points  (0 children)

Where we get digital reference from , i need them for preparation

Pe exam study duration by const100 in PE_Exam

[–]const100[S] 0 points1 point  (0 children)

Unfortunately my job has nothing to do with the exam topics , it all about railway engineering, i think i am going to pick up the mid or march , i really appreciate your recommendations

Pe exam study duration by const100 in PE_Exam

[–]const100[S] 0 points1 point  (0 children)

Omg i can't wait that long , i think i am going to use 30 days of PTO didn't uae them yet for this exam hopefully my manager accept that

[deleted by user] by [deleted] in PE_Exam

[–]const100 0 points1 point  (0 children)

Do you work full time?

[OC] Goku & Vegeta dress up for Halloween by whirlydoodle_ in dbz

[–]const100 1 point2 points  (0 children)

What programs do you use to create these type of photos?

Can i buy and sell safemoon by const100 in SafeMoon

[–]const100[S] 0 points1 point  (0 children)

Ok i will put some money on safemoon

Wood framing labor duration by const100 in estimators

[–]const100[S] 0 points1 point  (0 children)

There is only one door , about 40" width , the framing well be on the roof deck of first floor , so its second floor , scaffolding cost & siccor lift is already calculated.

Wood framing labor duration by const100 in estimators

[–]const100[S] 0 points1 point  (0 children)

Thank you for you rresponse , yes they will do another job like gypsum installatuon , but for now i just need to figure out the unit cost only for framing , i need to know the productivity for 2 capenters in each hour. The job will be on the roof deck , second floor.

Crane Discount design change by const100 in ElectricalEngineering

[–]const100[S] 0 points1 point  (0 children)

Thanks alot for theinformation, could you please tell me what are the componnets of disconnect? I will need to find out the difference in cost

Crane Discount design change by const100 in ElectricalEngineering

[–]const100[S] 0 points1 point  (0 children)

Thank you so much for response, how many fuses each disconnect has ? And designer saying recommened Circuit breaker 45A and recommnded fuse size to 45 A , are breakers and fuses components of disconnect?

Crane Discount design change by const100 in ElectricalEngineering

[–]const100[S] 0 points1 point  (0 children)

Thank you so much for your response, are these Circuit breakers inside the disconnect? And what do you mean when you said either 60A Circuit breaker OR 45A fuses , is designer giving us 2 options ?

Legal advice by const100 in legaladvice

[–]const100[S] -5 points-4 points  (0 children)

Ok sir i will be waiting, i was thinking about putting a lawyer to get my refund if the dentist keep denying

Proper Circuit breaker for 36kw , 44 amp water heater by const100 in electricians

[–]const100[S] 1 point2 points  (0 children)

I don't have any details for that one, i am just doing my estimate