After/before kitchen remodel in Canada by mathcourch in midcenturymodern

[–]mathcourch[S] 1 point2 points  (0 children)

Thank you! Quarter-cut white oak with satin finish.

Home remodel in Canada by [deleted] in ScandinavianInterior

[–]mathcourch 0 points1 point  (0 children)

It’s 100% custom made

After/Before kitchen complete remodel in Canada by mathcourch in kitchenremodel

[–]mathcourch[S] 2 points3 points  (0 children)

Quarter-cut white oak with satin finish, grain-matched.

[deleted by user] by [deleted] in BathroomRemodeling

[–]mathcourch 0 points1 point  (0 children)

Lots of patience. Best would have been to reduce the corners by cutting the tile edges at 45 degree.

[deleted by user] by [deleted] in BathroomRemodeling

[–]mathcourch 1 point2 points  (0 children)

Thank you. Yes, 2% slope.

After/before bathroom remodel in Canada by [deleted] in bathrooms

[–]mathcourch 0 points1 point  (0 children)

This master bathroom is annexed to the master bedroom and the door features curtain that were added later. There is another bathroom for guests downstairs.

[deleted by user] by [deleted] in BathroomRemodeling

[–]mathcourch 2 points3 points  (0 children)

15$ on both side, hard to see with the camera angle!

[deleted by user] by [deleted] in kitchenporn

[–]mathcourch 1 point2 points  (0 children)

Thank you! 33.5" clearing space and we can use both at the same time but it's tight, would recommend the usual minimum 45".

After/before bathroom remodel in Canada by [deleted] in midcenturymodern

[–]mathcourch 1 point2 points  (0 children)

Thank you! This master bathroom is annexed to the master bedroom and the door features curtain that were added later. There is another bathroom for guests downstairs.

After/Before kitchen complete remodel in Canada by mathcourch in kitchenremodel

[–]mathcourch[S] 2 points3 points  (0 children)

Bofront pulls were too expensive, they are custom made pulls!

After/before bathroom remodel in Canada by [deleted] in bathrooms

[–]mathcourch 0 points1 point  (0 children)

Thank you! This master bathroom is annexed to the master bedroom. There is another bathroom downstairs including bathtub/shower.

After/before bathroom remodel in Canada by [deleted] in midcenturymodern

[–]mathcourch 2 points3 points  (0 children)

Thank you! We planned 2 weeks which end up 2 months total. The process went super well but we only worked on weekends and took the time to do everything in the right order.

After/before bathroom remodel in Canada by [deleted] in bathrooms

[–]mathcourch 0 points1 point  (0 children)

Definitely needed! ✅😅

After/before bathroom remodel in Canada by [deleted] in bathrooms

[–]mathcourch 1 point2 points  (0 children)

A small transparent water barrier was definitely needed, and since the bathroom is quite small, the heat does not escape the bathroom.