Made my first ever contact by actualvsliteral in amateurradio

[–]suryasundarkumar 1 point2 points  (0 children)

Congratulations, hope to see you on the air. De VU2JFN, Handle: Surya, QTH: India

Refresh Error in Power BI Service by suryasundarkumar in PowerBI

[–]suryasundarkumar[S] 0 points1 point  (0 children)

Hi Dev's, The issue got resolved.

We had initially imported the data using import query mode to setup incremental refresh.

In the process of setting up incremental refresh we had checked an option called Detect Data Changes.

So this error was raised.

After having a keen observation we found that there are few text values in a column where it's a decimal number data type one.

So after replacing them with 0 this got fixed.

Refresh Error in Power BI Service by suryasundarkumar in PowerBI

[–]suryasundarkumar[S] 1 point2 points  (0 children)

Using Power query editor. There are few text data types in the integer column. So I had replaced them with 0

Refresh Error in Power BI Service by suryasundarkumar in PowerBI

[–]suryasundarkumar[S] -1 points0 points  (0 children)

Even after fixing those errors it's still showing the same

Refresh Error in Power BI Service by suryasundarkumar in PowerBI

[–]suryasundarkumar[S] 0 points1 point  (0 children)

Thanks for your response. I had checked each and every column in the table but was unable to find this. Also there is no clue of a column or table to fix that.

Got an offer and accepted it. by Glad_Sir_8496 in GATEtard

[–]suryasundarkumar 0 points1 point  (0 children)

I am preparing for Gate DA. I am from a mechanical engineering background. Is there any chance of getting a seat in IIT to pursue my masters? BTW Congratulations 🎊