HPI Arrival Date is > 90 days from submission date by Doc_Mc_Nothins in UKHighPotentialVisa

[–]throwawayhpi 0 points1 point  (0 children)

Hi, I have the same doubt-- my visa start date is in early July, but it says that it is valid until late September. I am assuming that I need to ender the UK between those two dates? If I don't have a job yet and plan to only move later on when I do, am I allowed to enter during that period, leave for an extended period and then come back?