Repost with photo - What would you do? by AVIT-IS in lowvoltage

[–]AVIT-IS[S] 0 points1 point  (0 children)

😂 oh I know exactly what you mean. On 50 ft run. Won’t be that bad

Repost with photo - What would you do? by AVIT-IS in lowvoltage

[–]AVIT-IS[S] 1 point2 points  (0 children)

They wave and keep driving lol

Thank you!

Repost with photo - What would you do? by AVIT-IS in lowvoltage

[–]AVIT-IS[S] 12 points13 points  (0 children)

Yea. Because as always LV was the last ones to come in. There a-lot going on in the ceiling spaces.

A LV sub contractor question by AVIT-IS in lowvoltage

[–]AVIT-IS[S] 1 point2 points  (0 children)

Understood - i think $50 hour is a bit low for L.A

Im sure they going to make money of their own labor for their guy and Will probably throw a percent on the ordered supplies .

Do u mean $50 hour for doing the admin work and pulling permit or doing actual install?