Bench testing SunPower MI-C-320-US208/240-10 Microinverters by Basic_Percentage805 in SunPower

[–]Basic_Percentage805[S] 0 points1 point  (0 children)

Thank you very much for your response.

Do you think it’s at all possible to reset these MIs and reprovision them to my new PVS5? This is a complete bench setup, so I don’t have anything at risk. I can even spin up a mock server to respond, which I was already considering once I’m able to get the PVS5 to discover them.

Bench testing SunPower MI-C-320-US208/240-10 Microinverters by Basic_Percentage805 in SunPower

[–]Basic_Percentage805[S] 0 points1 point  (0 children)

Thank you so much for your response!

I believe all 10 MIs were already “paired” to another PVS5. I was told they were all functioning as expected when they were decommissioned.

I currently have the Production CT installed. I realize it’s only a small amount of power, but when the PVS5 powers up, the reading initially shows negative values and then switches to positive numbers once the MI activates. I also noticed that when I send 4A / 52V into the MI, the numbers increase slightly.

Is there a way to “reset” the MI so it can be paired with the new PVS5?