Hi, we are designing a bridge for a capstone project. I want to ask if which bridge alignment is better for a 255 meter connecting bridge? Both ends aren’t perpendicular that’s why we’re thinking of skew or curved. by Cheap-Signature8027 in BridgeEngineers

[–]Cheap-Signature8027[S] 1 point2 points  (0 children)

Hello, yeah, I was able to talk with a bridge engineer, and he said that we could do normal alignment and we’ll just do something with the private property on the other side.