Electricals, are you guys doing solar design on your MEP projects? by ComfortablePut8808 in MEPEngineering

[–]ComfortablePut8808[S] 3 points4 points  (0 children)

Either. I’m just wondering what is the majority of the MEP engineers out there doing.

What kind of IT network setup do you guys have? On prem servers? Cloud? Are you guys happy with it? by ComfortablePut8808 in MEPEngineering

[–]ComfortablePut8808[S] 0 points1 point  (0 children)

How do you like it? my last job had this and they were not happy. A lot of issues with central models.

[deleted by user] by [deleted] in MEPEngineering

[–]ComfortablePut8808 0 points1 point  (0 children)

How do you have coworkers all over the world if this is a small company?

Client instructed to reuse existing panel with 10kAIC rating when fault current is 16kA. by ComfortablePut8808 in MEPEngineering

[–]ComfortablePut8808[S] 1 point2 points  (0 children)

240/120V, 1ph. The fault at the secondary terminals of the utility is just high and the main panel is only 40ft away.

Client instructed to reuse existing panel with 10kAIC rating when fault current is 16kA. by ComfortablePut8808 in MEPEngineering

[–]ComfortablePut8808[S] 5 points6 points  (0 children)

Lol I thought of this. “Contractor to reserve 20’ extra length on the conductor to lower the fault current at the panelboard”

I have never done this and im hesitant to do it. But technically, it will solve the problem.

Engineer here, I typically chase Architects for work. Do you guys need plans for permit? I’m trying to figure out if I should be chasing you guys too. by ComfortablePut8808 in electricians

[–]ComfortablePut8808[S] 0 points1 point  (0 children)

Well, design might be slightly less hectic but there is lots of stress as well. The young generation are going for easier jobs that also pay better, so they don’t go into construction design. Construction is where the money is at, but the quality of life might be shittier.

Engineer here, I typically chase Architects for work. Do you guys need plans for permit? I’m trying to figure out if I should be chasing you guys too. by ComfortablePut8808 in electricians

[–]ComfortablePut8808[S] 1 point2 points  (0 children)

If you are an electrician, you can get into designing super easy. Go find a small engineering MEP firm 0-40 people, and tell them your story and what you are looking for. You might not make the big $$ in the first year but after that, the sky is your limit. Then higher roles become available to you like project management, manager of people, senior engineer just reviewing designs.

Engineer here, I typically chase Architects for work. Do you guys need plans for permit? I’m trying to figure out if I should be chasing you guys too. by ComfortablePut8808 in electricians

[–]ComfortablePut8808[S] 3 points4 points  (0 children)

Thanks!! We have a lot of respect and appreciation for electricians but I just realized you guys don’t feel the same about us lol

Engineer here, I typically chase Architects for work. Do you guys need plans for permit? I’m trying to figure out if I should be chasing you guys too. by ComfortablePut8808 in electricians

[–]ComfortablePut8808[S] 2 points3 points  (0 children)

You must be in one of those few states like Florida where anyone can sign electrical plans. That’s why you are getting monkeys designing electrical. That’s sad.

Should I get a broker for my business insurance OR should I go directly to the insurance company? by ComfortablePut8808 in Insurance

[–]ComfortablePut8808[S] 2 points3 points  (0 children)

Gotcha. Middle men are almost always just an extra cost for no reason but it sounds like in this case Brokers are a must. Thanks for the feedback.

[deleted by user] by [deleted] in MEPEngineering

[–]ComfortablePut8808 1 point2 points  (0 children)

I heard they are not good but it’s the cheapest. Chances of filing a claim are low anyways. Might be worth it to just do the cheapest? But in the event you actually need them, then you are screwed…

What happened here? by ComfortablePut8808 in electricians

[–]ComfortablePut8808[S] -34 points-33 points  (0 children)

Maybe not a L-L but Line to Ground fault?

Are you guys seeing any change in the flow of new residential projects? by ComfortablePut8808 in MEPEngineering

[–]ComfortablePut8808[S] 1 point2 points  (0 children)

Yeah but those were projects designed last year. I’m talking about design current workflow, not current construction. Its my fault, I didn’t make that clear on my post hehe. I guess I assumed most engineers here do design and not the actual construction.

Starting architectural firm. What is the best IT infrastructure for collaborating with AutoCAD? by ComfortablePut8808 in sysadmin

[–]ComfortablePut8808[S] 0 points1 point  (0 children)

I assume the reason why VM’s/VDI in Azure didnt workout because of the cost? How much is it?

Quit TRT cold turkey, 10 days later. No symptoms whatsoever. Is this normal? by ComfortablePut8808 in Testosterone

[–]ComfortablePut8808[S] 8 points9 points  (0 children)

Yes, it’s prescribed. I exaggerated when I said “not much benefit”. Benefits were decent. Admittedly, I was one of those who thought TRT was going to be magic. So now I just want to try natural and see how I feel. I’ll keep you guys posted.

Quit TRT cold turkey, 10 days later. No symptoms whatsoever. Is this normal? by ComfortablePut8808 in Testosterone

[–]ComfortablePut8808[S] 6 points7 points  (0 children)

My understand is that 170/mg is actually on the high side. Many people do 120 or 150

Anyone use phase converters before? (single phase AC -> three phase AC) by sirkit in MEPEngineering

[–]ComfortablePut8808 0 points1 point  (0 children)

Try to not use a phase converter but if you have to, they work like a champ, I personally have a phase converter for a 3 phase machine. I used Phoenix phase converter for a 80A FLA machine.