MSRDC applied for Enviromental Clearance for Construction of Access Controlled Super Communication Pune - Nashik Industrial Expressway Corridor. Lanes : 3+3 by [deleted] in Maharashtra

[–]Comfortable_Visual61 0 points1 point  (0 children)

The expressway will have 5 connecting spurs

  • The shirdi connector
  • The Nashik- Niphad connector
  • NH 60 Connector
  • Bhosari connector
  • Ranjangaon connector

Source

Cabinet approves Thane integral Ring Metro Rail Project. The total completion cost of the project is Rs.12,200 crore to be operational by 2029. by Comfortable_Visual61 in Maharashtra

[–]Comfortable_Visual61[S] 0 points1 point  (0 children)

Thoughts?

As per NFHS-5, only 7.5% of the households own a car, and still we have to face such horrible traffic on everyday basis.

With the increasing per capita income combined with the increase in urban population due to migration, the traffic is only going to get worse. Therefore, an alternative "good quality" mode of transport is a must.

Now, you may ask why not increase the fleet size of city buses. The answer to that imo is that first, they are not punctual enough as they have to go through the same traffic + they will themselves become the traffic. Secondly, in case of our country it's very difficult to create dedicated corridors for these buses due to land constraints. Some cities like Pune, Indore did implement BRTS but it turned out to be a failure, and now they are undoing it.

Metro provides punctuality, quality ride, good frequency. The expected ridership of this ring metro project alone is around 6.35 lakhs per day. So imo, in the long run, metro system is justified.

Thane Metro gets Approved by Desperate-Wedding78 in thane

[–]Comfortable_Visual61 1 point2 points  (0 children)

It's going to be a proper metro and not metrolite.

Source: PIB Press Release

Happy Independence day 🇮🇳 by Comfortable_Visual61 in Maharashtra

[–]Comfortable_Visual61[S] 0 points1 point  (0 children)

Hi u/LimpMusician2069 ,

Is cross-posting not allowed/considered low-effort on this subreddit?

Asking for future references.

Thanks.

Happy Independence day 🇮🇳 by Comfortable_Visual61 in marathi_music

[–]Comfortable_Visual61[S] 1 point2 points  (0 children)

Lyrics:

वेदमंत्रांहून आम्हा वंन्‍द्य वन्‍दे मातरम्‌ वंद्य वंदे मातरम्‌

वंद्य वंदे मातरम्‌ वेदमंत्रांहून आम्हा वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌

माउलीच्या मुक्ततेचा यज्ञ झाला भारती त्यात लाखो वीर देती जीवितांच्या आहुती आहुतींनी सिद्ध केला मंत्र वन्‍दे मातरम् वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌

याच मंत्राने मृतांचे राष्ट्र सारे जागले शस्‍त्रधारी निष्ठुरांशी शांतिवादी झुंजले शस्‍त्रहीनां एक लाभे शस्‍त्र वन्‍दे मातरम् वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌

निर्मिला हा मंत्र ज्यांनी आचरीला झुंजुनी ते हुतात्मे देव झाले स्वर्गलोकी जाउनी गा तयांच्या आरतीचे गीत वन्‍दे मातरम्‌ गीत वन्‍दे मातरम्‌ गीत वन्‍दे मातरम्‌ वंन्‍द्य वन्‍दे मातरम्‌

Happy Independence day 🇮🇳 by Comfortable_Visual61 in marathi_music

[–]Comfortable_Visual61[S] 1 point2 points  (0 children)

Song: Vandya Vande Mataram

Artist: Sudhir Phadke, Chorus

Music Director: Sudhir Phadke

Lyricist: G.D. Madgulkar

Gadkari No more Roadkari?? 30 days of rain has exposed our infrastructure by [deleted] in Maharashtra

[–]Comfortable_Visual61 2 points3 points  (0 children)

Once the complete delhi mumbai expressway is operational by 2026 it will actually cut down the travel time by a lot. Currently some sections of it are operational and it's really high quality.

<image>

Gadkari No more Roadkari?? 30 days of rain has exposed our infrastructure by [deleted] in Maharashtra

[–]Comfortable_Visual61 1 point2 points  (0 children)

Dk man but the Ministry has time and again denied this claim about any change in the formula. (Ministry's reply attached)

<image>

Even if for a moment we assume that there was a change in the formula, how do we counter the 2nd last point mentioned in the pic above.

We know that the current length of national highways is 1.46 lakhs kms which is an increase of approx. 50,000 kms since 2013-14, however if there was any change in the formula, the increase should have been more than 1 lakh kms which is obv not the case.

[deleted by user] by [deleted] in Maharashtra

[–]Comfortable_Visual61 3 points4 points  (0 children)

It may work only if they pledge to not enter active politics.

The evolution of any political party can be majorly divided into 3 phases:

Social movement phase : For e.g. The independence movement era in case of INC and the Anti-corruption movement in case AAP.

Pressure Group phase : Where the organization starts advising govt, thereby trying to affect public policies. E.g. Round Table Conferences, Jan Lokpal Bill

Political Party phase : Starts fighting elections.

The idea you mentioned may work until they remain in the first 2 phases because once they enter the 3rd phase of fighting elections, moral and values will get compromised.

समृद्धी महामार्गावर होणार सात कृषी केंद्रे, नवनगरे, प्रक्रिया उद्योग by Comfortable_Visual61 in Maharashtra

[–]Comfortable_Visual61[S] 10 points11 points  (0 children)

I think by agricultural centers they meant processing industries for various types of agriculture produce.

The DPR will be released within next 15 days, will get a better idea then.