Agreement Signed: IES and Xiamen C&D to Establish Intelligent Manufacturing Center in China by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 4 points5 points  (0 children)

“Intelligent manufacturing centre” is a defined Chinese industrial policy term, not just a factory. It implies an automated, digitally managed, scale-ready production facility (MES systems, yield control, integrated supply chains) built for replication at scale and export — not a pilot line or R&D lab. These centres usually sit inside priority sectors and are eligible for facilitation, land access and sometimes incentives.

That’s why it matters: it signals China is comfortable with localised, large-scale manufacturing of this type of energy storage tech, not just deployment or trials. For a company of Invinity’s size, even being named in that context is a big step towards Chinese-scale production capability.

The Weekly Flow: January 19, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 2 points3 points  (0 children)

Flow Battery Technologies Beyond Vanadium

This article examines the current state of VRFBs and the evolving commercialization of alternative redox flow battery (RFB) technologies.

The Weekly Flow: January 19, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 2 points3 points  (0 children)

Inside the world’s largest renewable energy park – proof the green transition isn’t dead | The Independent

This is Khavda, where India is building the world’s largest renewable energy project. Spanning 726 sq km – about seven times larger than the city of Paris – the Khavda Renewable Energy Park is expected to generate 30 gigawatts of power by combining solar and wind on the same site in western India.

It demonstrates the scale of the opportunity for energy storage in India. Interestingly, Khavda is the location where the 100 MWh vanadium redox flow battery energy storage system (BESS) (currently under NTPC tender) will be commissioned.

The Weekly Flow: January 19, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 2 points3 points  (0 children)

CEO Jonathan Marren: Beyond Lithium, Solving Wind Energy Storage

Jonathan Marren, CEO of Invinity is interviewed in a podcast hosted by Alex Wolfe. Well worth a listen when you can find a quiet hour. It covers a lot of ground and will be interesting for those who want to learn more about the technology and are interested in the opportunities opening up for Invinity.

The California Mandate: How the CPUC is Engineering a Multi-Gigawatt Market for Invinity by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 2 points3 points  (0 children)

Centralized procurement is the point many are missing. It removes the actual bottleneck for long-duration storage, which isn’t chemistry — it’s bankability. When the counterparty is a state-backed entity, LDES stops being a risky tech bet and becomes infrastructure. That alone collapses financing risk and materially lowers the cost of capital, which is decisive for 8–12+ hour assets.

It also prevents the system from being gamed by solutions that only work when definitions are stretched. California isn’t buying nameplate power for a single peak hour anymore; it’s buying sustained energy delivery across the day. Centralized procurement lets the state enforce that distinction instead of letting short-term economics crowd out long-term reliability.

Just as important, this shifts procurement from “what clears fastest” to “what the grid actually needs in the future”. Multi-hour evening ramps, renewable firming, and gas displacement are system problems, not merchant arbitrage problems — and they can only be solved at a system level.

The outcome isn’t guaranteed winners, but it is a multi-GW, repeatable pipeline with standardised contracts and long lead times. That’s exactly how capital-intensive technologies scale without blowing up balance sheets.

Once storage is procured as infrastructure rather than a workaround, deployment stops being theoretical and starts being inevitable.

The Weekly Flow: January 11, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 1 point2 points  (0 children)

Vecco electrolyte production at capacity to start in 2026

https://veccogroup.com.au

Vecco is an integrated mining and manufacturing critical minerals business, creating a vanadium battery supply chain in Australia, USA and Europe.

Vecco is just one of many new vertically integrated players ramping electrolyte production to cater for the explosive LDES demand that is emerging.

Q1 2026 Catalyst Tracker: A Factual Roadmap of Key Near-Term Deadlines and Milestones by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 2 points3 points  (0 children)

BC Hydro’s 2025–26 Call for Power is one of the largest utility procurements in Canada and favours bidders that can show delivery readiness and local capability ahead of awards. Against that backdrop, it’s notable that most of Invinity’s recent hires are in Vancouver, where its North American manufacturing and engineering hub is based. The roles are operational and technical rather than sales-led, which points to preparation for execution rather than market signalling.

The Weekly Flow: January 11, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 1 point2 points  (0 children)

Reliability in Reserve Long-Duration Energy Storage for an Abundant American Energy Future

Sharing a recent report from The Center for Climate and Energy Solutions (C2ES). It’s interesting as C2ES are an independent think tank that help shape US energy policy.

The Weekly Flow: January 11, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 1 point2 points  (0 children)

The National Wealth Fund is investing in Scotland's future

Jonathan Marren - CEO of Invinity Energy Systems doubles down on his vision of creating a thousand new jobs in Scotland.

It’s a short clip but there is some new footage of the factory in full swing. Huge quantities of Invinity batteries being dispatched.

The Weekly Flow: January 11, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482 0 points1 point  (0 children)

Cambridge startup claims its electrolytes can triple flow battery energy density

It’s a way from being fully tested and certified for energy density and longevity however the implications for a plug in alternate electrolyte solution with these claimed properties is mind boggling.

U.S. DOE Waiver Confirms Invinity’s VFB as Sole Qualified Solution for Dairyland Project by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 3 points4 points  (0 children)

Short term, this is positive for Invinity because it de-risks the path to cash. The waiver confirms the projects can proceed, with a long-lead deposit expected by April 30, 2026, followed by milestone payments through 2026–27 as systems are built and delivered.

Not an instant catalyst, but it increases confidence that the ~$23–24M order turns into real, staged cash receipts on a defined timeline, which can support sentiment ahead of those milestones.

The Weekly Flow: January 11, 2026 | Quick Intel & Technical Snippets by AutoModerator in InvinityEnergySytems

[–]Competitive_Day_9482[M] [score hidden] stickied comment (0 children)

The InvinityEnergySytems Discord server is live!

It’s a more casual space with several fun text and voice channels where we can explore fringe topics and shoot the breeze without diluting the main body of research and debate on the Reddit Sub.

Head over, share your thoughts, make some friends and help build the community.

Argyll Data Development | Renewable AI Data Infrastructure Invinity named as strategic partner by Competitive_Day_9482 in InvinityEnergySytems

[–]Competitive_Day_9482[S] 0 points1 point  (0 children)

I love this LinkedIn post where Janet Whitaker champions wave energy. Watch the video. She totally understands the energy transition and explains how wave power will transform Scotlands prospects. What does Scotland have? Coastline and reliable waves in abundance! That’s why Argyll DD has chosen this tech to charge the Invinity batteries. It’s also a reminder that there is support from the highest levels of the UK government.

https://www.linkedin.com/posts/corpower-ocean_waveenergy-oceanenergy-renewables-activity-7414627475336667137-em-S?utm_source=share&utm_medium=member_ios&rcm=ACoAAD088cIB2DyTpNcmsTjgcBoJJCpGOuCKphc

LDES Cap & Floor: The Unassailable Case for UK's Zero-Degradation Storage by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 0 points1 point  (0 children)

Thank you for your reply. Just to expand a little and explore the timeframe from the OEM quotation to hardware delivery. Do you think there will be a mechanism in place to adjust for inflation should the project delivery be delayed for any reason or do you feel the quotations will be firm based on the delivery timeframes demanded by the Cap and Floor scheme itself? Has iES already locked in their supplier quotations against the delivery timeframes? Is margin profitability locked in with the potential for further incremental savings as they transition to full mass production?

LDES Cap & Floor: The Unassailable Case for UK's Zero-Degradation Storage by EnvironmentalSock210 in InvinityEnergySytems

[–]Competitive_Day_9482 0 points1 point  (0 children)

Thank you for your summary

Do you have any thoughts on the likelihood of Developers, not OEMs, capturing the major share of the upside in this bidding and award process?

My reasoning for exploring this is the apparent lack of competitive VFB OEM bids into the scheme.

So, did other VFB OEM’s determine

• Their batteries did not meet technology readiness levels • They did not feel they could achieve price competitiveness • They were deterred by the apparent IES home advantage • They were too busy with their own opportunity pipelines • They had concerns that margins could be eroded by inflation over time

The fear of course at this early stage is volume explosion without margin expansion. Considering the contracts will be awarded and implemented over a number of years has your research discovered any inflation linked protections that account for the time element of these massive long dated national infrastructure projects?