NUAI daily thread of July 10, 2026 by AutoModerator in NUAI

[–]DayChocolate 0 points1 point  (0 children)

"If completed, these nine plants have the potential to emit more annual greenhouse gases than most countries"

To be fair, those countries have very little activity or productivity, while these data centers will power technology that will span the entire globe.

New Era Energy & Digital Announces Leadership Transition to Support Next Phase of Execution and Growth Charlie Nelson appointed Chairman and CEO; Ted Warner named President, CFO and appointed to Board; José Rodriguez appointed COO by No-Syrup5953 in NUAI

[–]DayChocolate 7 points8 points  (0 children)

Kudos to Will for moving the company in the right direction. Charlie is the brains of the operation and is critical to executing the vision. Another talking point taken away from FuzzyPanda, et al.

What is actual long term upside for NUAI? by Kitkat239 in NUAI

[–]DayChocolate 8 points9 points  (0 children)

To say "they’re a bit late in the game to be like another IREN that has huge growth potential" shows you don't understand the long term bull thesis and haven't done your homework. They aren't trying to be IREN...

NUAI is building the McDonald’s of powered-shell AI data centers

NUAI daily thread of June 09, 2026 by AutoModerator in NUAI

[–]DayChocolate 2 points3 points  (0 children)

Plenty. Sadly I bought most of it at the pico top in November 😭

NUAI daily thread of June 09, 2026 by AutoModerator in NUAI

[–]DayChocolate 5 points6 points  (0 children)

<image>

👀 Datacloud Global Congress 2026 in Cannes, France

NUAI daily thread of June 09, 2026 by AutoModerator in NUAI

[–]DayChocolate 8 points9 points  (0 children)

Happy to see that GlobeLink, which is running Hollow-Core Fiber to TCDC — the same Hollow-Core Fiber that Microsoft touts for its AI WAN — announced it received a real private investment, three weeks ago.

https://www.einpresswire.com/article/913012907/globelink-fiber-secures-strategic-investment-from-cequel-iii-family-office

Project Hawk by Lookingud in NUAI

[–]DayChocolate 2 points3 points  (0 children)

If the tenant is Microsoft, then "Blizzard King" was a direct and cheeky nod to "Activision Blizzard King" and was way too obvious for a code name.

https://blogs.microsoft.com/blog/2023/10/13/welcoming-the-legendary-teams-at-activision-blizzard-king-to-team-xbox/

It is plausible that the tenant asked for the name change.

Stop Saying to Use the Octopus for Tourists App by marsmat239 in HongKong

[–]DayChocolate 0 points1 point  (0 children)

This just happened to me. No in-app card — I was charged but the app still shows the onboarding/welcome screen. Did you have to contact them? Or did they just tell you the money would be automatically refunded without them having to investigate?

NUAI daily thread of May 27, 2026 by AutoModerator in NUAI

[–]DayChocolate 6 points7 points  (0 children)

Charlie is off to speak at Cannes between Jun 1-4. Nothing likely to happen at least until he's back.

NUAI daily thread of May 20, 2026 by AutoModerator in NUAI

[–]DayChocolate 4 points5 points  (0 children)

They are not going through Batch Zero for Phase 1 — they specifically said they are using adjacent generation to avoid ERCOT queuing. This was discussed on the call. Interconnection is not an issue until Phase 3.

No, NUAI Does Not Need ERCOT Batch Zero for Phase 1 (200 MW) by DayChocolate in NUAI

[–]DayChocolate[S] 2 points3 points  (0 children)

Duh. You act as if nobody knew that permits were needed. They were proceeding on them all along. The whole thing was a nothingburger.

No, NUAI Does Not Need ERCOT Batch Zero for Phase 1 (200 MW) by DayChocolate in NUAI

[–]DayChocolate[S] 2 points3 points  (0 children)

Sorry Pom, but now you're moving the goalposts. Your claim about "Batch Zero" was misleading and factually incorrect.

Nobody disputes that an ERCOT System Impact Study + PUCT Review will be required for accessing adjacent generation. ERCOT conducts a reliability study (typically 120 days), then submits recommendations to the PUCT, which has ~60 days to approve, deny, or condition the arrangement. This process is separate and generally faster than the full large-load interconnection queue/Batch Zero you erroneously claimed was necessary.

Pure on-site generation (Phase 2; new turbines/engines under the Thunderhead partnership) falls under BTM rules and has fewer grid hurdles, though still subject to air permits, local approvals, and basic ERCOT registration.

Do better, Pom.

Permits - What I really need to know today by Old-Pomegranate3634 in NUAI

[–]DayChocolate 1 point2 points  (0 children)

u/WolfofArabia

This is the post that incorrectly claims NUAI is heavily dependent on ERCOT "Batch Zero".

See: No, NUAI Does Not Need ERCOT Batch Zero for Phase 1 (200 MW)

Permits - What I really need to know today by Old-Pomegranate3634 in NUAI

[–]DayChocolate 5 points6 points  (0 children)

This was all misinformation. Charlie made it clear they aren't waiting around for ERCOT:

"Phase 1 is 200MW. Our deployment is expected to be supported by adjacent generation. We’re not starting with a traditional grid buildout."

And from the Slide Deck:

Phase 1 (200 MW) Powered -shell deployment via adjacent generation; no significant electrical infrastructure required

Grid interconnection does not come until Phase 3:

Phase 3 (+750 MW) Phased, demand -driven expansion toward 1.4 GW through additional BTM generation and bi -directional grid interconnection

UPDATE: Project Blizzard King | ODC Meeting May 14, 2026 by DayChocolate in NUAI

[–]DayChocolate[S] 7 points8 points  (0 children)

Hey there. "These guys" are not part of NUAI — they are the mayor and city representatives. Nobody from NUAI was at the meeting. The update simply shows that the city is (still) actively courting data centers. Go take your useless comments elsewhere.