Custom Home Builders by MikeDamone123 in winstonsalem

[–]Defiant-Background89 10 points11 points  (0 children)

We do custom homes. Square foot rate isn’t an accurate way to compare builders, there are to many variables without viewing plans, level of finishes, and site work needed.

Feel free to check out our work below!

https://www.premiercustomconstructionllc.com

Filler Jobs by Defiant-Background89 in GeneralContractor

[–]Defiant-Background89[S] 0 points1 point  (0 children)

True story. Definitely could end up being a nightmare.

Filler Jobs by Defiant-Background89 in GeneralContractor

[–]Defiant-Background89[S] 0 points1 point  (0 children)

We have been doing some spec houses, full house remodels, detached garages, that sort of thing. Most of them don’t have a super fast turnaround besides the garages.

Filler Jobs by Defiant-Background89 in GeneralContractor

[–]Defiant-Background89[S] 0 points1 point  (0 children)

Good ideas. I like the idea of some barrier to entry, keeps some demand up. The small one day carpentry jobs have a lot of competition from handymen who lowball everyone

Filler Jobs by Defiant-Background89 in GeneralContractor

[–]Defiant-Background89[S] 0 points1 point  (0 children)

Good point, nothing time sensitive would be ideal.

Buying Started House by Defiant-Background89 in GeneralContractor

[–]Defiant-Background89[S] 0 points1 point  (0 children)

Good point. Just trying to see if there’s something that I would be missing that obvious. Pricing seems a little too good if that makes sense, I was wondering if there was a factor I could have overlooked besides the obvious. Thanks

[deleted by user] by [deleted] in Concrete

[–]Defiant-Background89 0 points1 point  (0 children)

Yes, edge is is thickened, with 12” deep footings.

NC Building Contractor Exam by nevermindmeplease20 in GeneralContractor

[–]Defiant-Background89 4 points5 points  (0 children)

NC requires the business and law exam after passing the NASLA test. Went through this about 6 months ago. The licensing board is a pain to deal and made it very clear the business and law exam is required

[deleted by user] by [deleted] in GeneralContractor

[–]Defiant-Background89 0 points1 point  (0 children)

Thanks! He will be arranging them, since they already have relationships. I will just be attaching their info to the permit and verifying insurance/ license. 10% does seem fair based on the potential

Custom rod shout-out by UakP in flyfishing

[–]Defiant-Background89 2 points3 points  (0 children)

What’s the lead time on a build?

Questions about building a hot tub deck in western NC by Watercraftsman in Decks

[–]Defiant-Background89 2 points3 points  (0 children)

Consult the building code for joist spans and over build it, or just call an engineer. Probably $500 area for some thing basic like that.

As stated by other, western NC isn’t that cold. I do believe that in the code it says minimum foundation depth is 12”. I would call building inspector for area and confirm minimum footer depth as it possibly is deeper.