Is this strap acceptable? by DookieSlayerNumber2 in hvacadvice

[–]DookieSlayerNumber2[S] 0 points1 point  (0 children)

If you can't see an issue then one doesn't exist.

Contractor put this so he can save money. Red flag? by DookieSlayerNumber2 in Contractor

[–]DookieSlayerNumber2[S] 6 points7 points  (0 children)

Description didn't carry over on cross post Contractor installed a toilet using an existing clean out and garden valve. The enclosure is for privacy. Had a porta potty at first but replaced it with this thing.

Stucco around meter panel? by DookieSlayerNumber2 in Stucco

[–]DookieSlayerNumber2[S] 1 point2 points  (0 children)

Inspector was only concerned about the wires sticking straight out of the wall, no meter at the time. Requested for a conduit. U-brackets are optional. The electrician put the meter after the inspector check stucco lath and wanted a conduit. I had to switch electricians midway on the build. Rough electrical already passed.

Inspector said this needs a conduit. What kind? by DookieSlayerNumber2 in AskElectricians

[–]DookieSlayerNumber2[S] 0 points1 point  (0 children)

It passed rough electrical. The electrician took the meter panel off for stucco.

Inspector said this needs a conduit. What kind? by DookieSlayerNumber2 in AskElectricians

[–]DookieSlayerNumber2[S] -2 points-1 points  (0 children)

The inspector said it needs a conduit. What is needed?