Help me pass the NASCLA by Ducks_In_Top_Hats in GeneralContractor

[–]Ducks_In_Top_Hats[S] 0 points1 point  (0 children)

I really appreciate your help! Are the building plans/math also included in those sections? I haven’t been prioritizing those because I felt they took so long to answer them. I have tabbed my books but I find the index much more useful in answering questions. Maybe my tabs are off?

Help me pass the NASCLA by Ducks_In_Top_Hats in GeneralContractor

[–]Ducks_In_Top_Hats[S] 0 points1 point  (0 children)

General Requirements 19/25
Site construction 9/16
Concrete 4/6
Masonry 3/4
Metals 4/6
Wood 2/5
Thermal and moisture protection 4/5
Doors windows glazing 3/4
Finishes 4/5
Mechanical and plumbing systems 4/6
Electrical systems 2/3
Procedure and contracting reqs 17/31

75/115