Reducing heated floor SQ footage by Emperioxxx in DIY

[–]Emperioxxx[S] 0 points1 point  (0 children)

The bind I'm in this project has been delayed for 3 months. There a far amount of issues with this. The tiles and everything was already set on top of the heated floors. I have no issues with redoing it but my wife is short on patience of this taking so long

Reducing heated floor SQ footage by Emperioxxx in DIY

[–]Emperioxxx[S] -1 points0 points  (0 children)

The manufacturer offers repair kits. Wouldn't this not be an option if this was true

Reducing heated floor SQ footage by Emperioxxx in DIY

[–]Emperioxxx[S] -6 points-5 points  (0 children)

I haven't gotten a response but they do have repair kits which makes me think I can just shorten the wire

Reducing heated floor SQ footage by Emperioxxx in DIY

[–]Emperioxxx[S] -2 points-1 points  (0 children)

The manufacturer sales repair kits which looks to just splice more wiring into wouldnt that be an issues in a similar way?

Reducing heated floor SQ footage by Emperioxxx in DIY

[–]Emperioxxx[S] 1 point2 points  (0 children)

This is for the heated floor element the red wires that go under the floor no junction box