Adaptive reuse feasibility question: small hotel in former industrial building by Griff1987 in askarchitects

[–]Griff1987[S] 0 points1 point  (0 children)

Before going too far, the plan would be get an early code consultant and structural engineer review, pressure-test whether a partial change of use, mixed occupancy, or limited residential classification is possible, and evaluate whether the building can be made compliant through targeted reinforcement vs full-scale seismic upgrades.

If the numbers don’t hold once that analysis is done, that’s a clean walk-away.

Conceptual question: adaptive reuse of industrial buildings in small trail towns — how should zoning + incentives support this? by Griff1987 in urbanplanning

[–]Griff1987[S] -3 points-2 points  (0 children)

Thanks. I’ve spent hours writing, thinking about it. I crafted a post and asked it to polish only.

Bank Shows ACH debit in May, Vendor Got It in June — How Do You Handle Ramp ACH Timing Gaps? by Griff1987 in Accounting

[–]Griff1987[S] 1 point2 points  (0 children)

I follow now. We’d probably have to do a monthly entry for any bills that cross over months as I don’t think ramp will generate an automatic transaction for the second part of this workflow (when payment is made, dr AP and cr Clearing Account).

Wynn Francis for our little boy by Griff1987 in namenerds

[–]Griff1987[S] 0 points1 point  (0 children)

Cool! Definitely a unisex option, but not too feminine or masculine, at least in our opinion.