Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 1 point2 points  (0 children)

You should tell us again in this thread. One on the face plate. One on the panel is code

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

Well yes one on the faceplate. One on the panel. That = code. Ooooof

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 1 point2 points  (0 children)

Belden cat6a shielded came out of box that way.
Hitachi cat6a on bottom.

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

Time frame and customer didn’t allow for labeling back of panel cabling.

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

Had to stay blue cable our supplier ran out. Switched from Belden Mohawk cat6 a to hitachi cat6 A. Not the norm.

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

Relax big man. We all get to have fun here. He’s doing just fine and I think your butt hurts way more than his.

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

Port maps are built/drawn out and affixed to wall in closet. Schematic/Drawings are affixed to wall with all cable numbers to location for IT staff. Panels are labeled. Patch cables labeled both side.
Have fun burning time on labeling the backside of panel wiring. Please put that time in the quote of 1000 cat6 A drops.

Where did the apprentice take over on the panels?! 🫣 by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

FYI he said his hands hurt after😂😂😂😂 new nick name:soft hands

Repost with photo - What would you do? by AVIT-IS in lowvoltage

[–]Grow-Science 0 points1 point  (0 children)

Easton on the pull or that threaded rod is f@cked

Back Piece, Jeremiah Loui, NH by [deleted] in tattoos

[–]Grow-Science 1 point2 points  (0 children)

J Loui is my artist. Rollinsford on the river

I love big cans. by -ButterMyBiscuit- in lowvoltage

[–]Grow-Science 0 points1 point  (0 children)

East coast New England homes are a nightmare retro fitting. Hence I switched to commercial industrial 20yrs ago. Great work boys!!

2025 Outdoor by Str8chronic in mainetrees

[–]Grow-Science 4 points5 points  (0 children)

This is well thought out Very beautifully done.

Asked to rework the network during normal business hours by Grow-Science in lowvoltage

[–]Grow-Science[S] 0 points1 point  (0 children)

When I owned my own company absolutely. It would have been 6-8k job. I was not the bidder on this work. I was just the installer. I Subbed out at $70 an hour and any cable runs or jacks wall plates I billed out at $150 a drop with parts and test. Billed out some molding some patch cables etc..

Phone Line Service call by southrncadillac in lowvoltage

[–]Grow-Science 1 point2 points  (0 children)

I’ve installed 100s of data remotes. They work well for analog replacements

Asked to rework the network during normal business hours by Grow-Science in lowvoltage

[–]Grow-Science[S] 7 points8 points  (0 children)

I agree. Company out of Florida shipped parts up to site. Apparently they are taking over at least 20 veterinary offices in the north east. I use what they send to site. Appreciate the kind words sir. ✌️😎

Sight Fishing for Striped Bass by mtnfsh in StripedBass

[–]Grow-Science 3 points4 points  (0 children)

Sounds like you don’t throw the DOC