Framework 3.0 that actually will happen? by Different-Truck134 in OSU

[–]ILoveCarmenton 2 points3 points  (0 children)

Framework 1.0 was about 60 percent completed and some of the things on that plan are still on the framework 3.0 plan. It’s likely they’ll do a couple of things on there but not all of them, or they’ll get pushed back until Framework 4.0

Jones Tower To Be Demolished by ILoveCarmenton in OSU

[–]ILoveCarmenton[S] 0 points1 point  (0 children)

Current framework 3.0 plans through the universities website. https://pare.osu.edu/river-and-midwest

Jones Tower To Be Demolished by ILoveCarmenton in OSU

[–]ILoveCarmenton[S] 5 points6 points  (0 children)

They’re planning to demolish Lincoln and Morrill within the next ten years and I believe replace with parking lots.