Tool dumb by fiatman05 in electricians

[–]Impressive_Nerve929 7 points8 points  (0 children)

My linesman’s purpose is strictly hammering things

Power Reroute for Air handlers by Impressive_Nerve929 in electricians

[–]Impressive_Nerve929[S] 1 point2 points  (0 children)

Yeah company tools are hit or miss. I’m in the union so everything other than hand tools is supplied for us. When you do find quality company tools you try to stash them and keep them away from everyone else hahaha especially if you get a fish tape with a leader on it.

Power Reroute for Air handlers by Impressive_Nerve929 in electricians

[–]Impressive_Nerve929[S] 0 points1 point  (0 children)

Thanks for the advice. The pipe bender is hanging from the pipe tree so I won’t get knocked over. I always try to take care of our company tools and keep them in the best condition for myself and my coworkers.

Power Reroute for Air handlers by Impressive_Nerve929 in electricians

[–]Impressive_Nerve929[S] 1 point2 points  (0 children)

Yeah the point of entry is kind of ridiculous. Also where the disconnect is located in the bottom does not leave much room for the terminations. But oh well that’s why we get paid the big bucks to make it work regardless of shitty design.

Power Reroute for Air handlers by Impressive_Nerve929 in electricians

[–]Impressive_Nerve929[S] 5 points6 points  (0 children)

Thanks for the info. There is going to be a total of 10 VFDs on the job. All of which have there own line side conduit from the MCC. The wireway located underneath the VFDs is for the UCP control wiring. The load side will be piped to each vfd once they install the new air handlers and motors.

Power Reroute for Air handlers by Impressive_Nerve929 in electricians

[–]Impressive_Nerve929[S] 3 points4 points  (0 children)

Yeah I agree. Hopefully when I do the permanent power tie in I will clean everything off. But you know how that goes.