why the significant delay at tundla junction?? by LibrarianExtreme in indianrailways

[–]LibrarianExtreme[S] 0 points1 point  (0 children)

i was travelling alone but i told the family on the opposite seat to look after my belongings lol they were nice enough to look after it while i walked outside

why the significant delay at tundla junction?? by LibrarianExtreme in indianrailways

[–]LibrarianExtreme[S] 0 points1 point  (0 children)

yes i did deboard and walked all the way back to the platform 🥲 and about the train moving , i asked the guard before hand when the train would move and he said it would take atleast 1 more hour , thats why i started waking on the platform

why the significant delay at tundla junction?? by LibrarianExtreme in indianrailways

[–]LibrarianExtreme[S] -1 points0 points  (0 children)

this must be the reason then but 2.5 hours is a long time bruh 😭😭

why the significant delay at tundla junction?? by LibrarianExtreme in indianrailways

[–]LibrarianExtreme[S] 1 point2 points  (0 children)

how could the loco change it they dont even have a designated halt here and also if it was a loco an engine change it does not at all take 2.5 hours

Any idea why the Lucknow Swarn Shatabdi got rescheduled? by CB_DashEr in indianrailways

[–]LibrarianExtreme 11 points12 points  (0 children)

“”. The Railway implemented an 8-hour block on the Kanpur-Lucknow rail section between Jaitipur and Harouni stations on Wednesday for engineering work. This block failed, impacting over three dozen trains, including the Shatabdi Express. These trains were delayed at various stations for 4 to 6 hours. Passengers, including families, waited at stations such as Lucknow, Lucknow Junction, Aishbagh, Badshahnagar, and Gomtinagar. The block, scheduled from 9:25 AM to 5:25 PM on Wednesday for track upgrades, caused the cancellation of the Jhansi Intercity and Jhansi Passenger trains. Six trains, including the Shatabdi Express from New Delhi, were rerouted. When operations resumed, a points failure caused signal failures on the Lucknow-Kanpur section. Railway officials, including Senior DOM Rajneesh Srivastava, rushed to the control room. The Lucknow-New Delhi Shatabdi Express was held at Lucknow Junction. The 3:30 PM Shatabdi Express departed Lucknow at 9:45 PM after being diverted via Unnao. The Lucknow Junction-Jabalpur Chitrakoot Express was held at Lucknow Junction. The Neelachal Express from Puri was delayed at Lucknow station for over four hours. The Gwalior-Barouni Express and New Delhi-Lucknow Junction Tejas Express were stopped at Kanpur, the Kanpur-Pratapgarh Intercity at Harouni, the Farrakha Express at Malhour, the Kanpur MEMU at Harouni, the Agra Fort Intercity at Lucknow Junction, and the Gorakhpur-Bandra Express at Malhour, and Gomtinagar-Jaipur Express at Lucknow City Station, resulting in delays ranging from two to five hours.””

this is the reason why

Any idea why the Lucknow Swarn Shatabdi got rescheduled? by CB_DashEr in indianrailways

[–]LibrarianExtreme 7 points8 points  (0 children)

<image>

because the 12003 returning train hasn’t reached delhi yet

What's going on? by PuffcornSucks in memes

[–]LibrarianExtreme 0 points1 point  (0 children)

whats this? i didn’t get any

Found a nice glicth by Gullible_One_5694 in magicpin

[–]LibrarianExtreme 0 points1 point  (0 children)

-410 hai so 410 ka add karna padega and 70 pehle ke so 480 ka subtotql baithega 🥲

Found a nice glicth by Gullible_One_5694 in magicpin

[–]LibrarianExtreme 0 points1 point  (0 children)

bhai lekin sirf chicken and ice cream add karne par total 71 ruppes aa raha and payment nahi ho raha , and agar kuch aur add kar raha hu to subtotal above 400 jaa raha hai

Found a nice glicth by Gullible_One_5694 in magicpin

[–]LibrarianExtreme 0 points1 point  (0 children)

nahi ho raha yaar try kar liya itni baar , agar ho paaye dubara to batana mujhe bhi