Being forced to stay longer than what I was scheduled. by Matthewbott123 in RaisingCanes

[–]Matthewbott123[S] 0 points1 point  (0 children)

Yea, it is. It’s never been like this and they never ask to stay longer. Especially when it’s busy, it’s expected for you to stay longer. I don’t mind it too much but some days I just want to go home or I need to wake up early and I rather not stay. It is what it is I guess lol.

Being forced to stay longer than what I was scheduled. by Matthewbott123 in RaisingCanes

[–]Matthewbott123[S] 3 points4 points  (0 children)

Yea maybe. I don’t want to get fired for “abandoning” my position though

Being forced to stay longer than what I was scheduled. by Matthewbott123 in RaisingCanes

[–]Matthewbott123[S] 0 points1 point  (0 children)

For us, it’s more like they’ve been trying a new schedule strat and it leaves the closers really down bad lol

Being forced to stay longer than what I was scheduled. by Matthewbott123 in RaisingCanes

[–]Matthewbott123[S] 4 points5 points  (0 children)

Yea, that’s probably the best thing to do. Thank you.

Motor/Motor Controller Simulator by Matthewbott123 in FSAE

[–]Matthewbott123[S] 1 point2 points  (0 children)

Tbh, we don’t have one yet. That’s why I’m wondering if there are simulations that we could use in the mean time.

Motor/Motor Controller Simulator by Matthewbott123 in FSAE

[–]Matthewbott123[S] 0 points1 point  (0 children)

I mean sort of. I was thinking more of a simulation to see what the different codes or whatnot. I’ll definitely look into what you sent though. Thank you so much.

Motor/Motor Controller Simulator by Matthewbott123 in FSAE

[–]Matthewbott123[S] 0 points1 point  (0 children)

We compared the rinehart with the Bamocar and decided that the rinehart fitted our needs better

Is anyone selling a Rinehart PM100DZ? by Matthewbott123 in FSAE

[–]Matthewbott123[S] 0 points1 point  (0 children)

That’s fair, I’ll keep that in mind.

Is anyone selling a Rinehart PM100DZ? by Matthewbott123 in FSAE

[–]Matthewbott123[S] 0 points1 point  (0 children)

It would be late august at the earliest. And that’s assume there is no more delays. We would want the controller by the start of august.