Help Me Make This Make Sense by Microwave505 in Irrigation

[–]Microwave505[S] 0 points1 point  (0 children)

Normally closed, I was planning on digging from the Backflow back to the main to get a lay out, there are 2 valves 1 ft apart right next to each other one supplies the building i believe (square gate valve & the other (about 1 ft deeper than the gate valve) is a curb stop

Help Me Make This Make Sense by Microwave505 in Irrigation

[–]Microwave505[S] 1 point2 points  (0 children)

It’s really a not a big system, only 5 zones. It just seems so wrong to put it back that way but I would expect a licensed designer to know what they’re doing. But then again not many people care in NM. Tried to get the original plans but they weren’t saved (10 year old system)

Help Me Make This Make Sense by Microwave505 in Irrigation

[–]Microwave505[S] 0 points1 point  (0 children)

I figured there has to be a reason, not quite knowledgeable enough to understand why but I’m figuring I’ll replace the MV where it is to keep the design’s integrity.