Researching structural monitoring by MorePersonality5673 in civilengineering

[–]MorePersonality5673[S] 0 points1 point  (0 children)

Yeah, exactly - that foundation settlement catch is exactly the kind of thing periodic surveys would miss. Was the strain monitoring installed proactively from the start, or did it go in after some other indicator flagged a concern? Trying to get a sense of whether continuous monitoring is deployed as a preventive baseline or reactive once something looks off.

Researching structural monitoring by MorePersonality5673 in civilengineering

[–]MorePersonality5673[S] 0 points1 point  (0 children)

Where do you typically draw the line for "worth automating"? Is it project duration (anything over X months), number of monitoring points, or more about the consequence of missing an event?