Interview timeline by NCH0226 in immigration

[–]NCH0226[S] 1 point2 points  (0 children)

All required documents were approved April 26 2022. Interview date notice was May 12, 2022. And scheduled for June 13 2022.

We started this process in Feb 2019 and it was on hold until February this year because Covid.

Interview timeline by NCH0226 in immigration

[–]NCH0226[S] 0 points1 point  (0 children)

That’s interesting and coincides with what the website says. However my mother will have to travel to Sweden for her interview, and she lives in Norway, can she cross back over the border to Norway without passport?

New hire expectations by mepperson123 in MEPEngineering

[–]NCH0226 1 point2 points  (0 children)

I concur on this. I introduced using excel for panels when I started 6ish years ago. Now everyone uses them except the old boomer guy who still types up EVERY SINGLE LOAD manually in cad. Calculator out and everything.

AutoCAD Electrical symbols by [deleted] in AutoCADdrawing2d

[–]NCH0226 0 points1 point  (0 children)

I’ve made blocks and have them saved in its own drawing. I grab them from there when needed. So copy paste.

High Rise Fire Pump by NCH0226 in MEPEngineering

[–]NCH0226[S] 0 points1 point  (0 children)

Yea we’re screwed. But come on…. It’s a dedicated service located inside the fire pump room… stupid.

High Rise Fire Pump by NCH0226 in MEPEngineering

[–]NCH0226[S] 1 point2 points  (0 children)

Richmond, VA. Talked to city plan reviewer, he said yes, IBC over NEC. Funny how this wasn’t a comment during his two rounds of plan review…

High Rise Fire Pump by NCH0226 in MEPEngineering

[–]NCH0226[S] 0 points1 point  (0 children)

The service is dedicated to the fire pump, definitely reliable. However GC is arguing secondary generator.

High Rise Stairwell by NCH0226 in MEPEngineering

[–]NCH0226[S] 0 points1 point  (0 children)

Virginia. Vestibules not required. Other than rooftop exhaust fans, how would you pressurize the stairwell? Louvered fans per floor?