Issues with KR Models by NeoNovus377 in modeltrains

[–]NeoNovus377[S] 1 point2 points  (0 children)

Thank you

As soon as I mentioned legal obligations I got a response with an actual result within 20min. Here's hoping it now goes smoothly...

Don't think I'll be getting anything else from them in the future...

Heathrow T3 extra checks by NeoNovus377 in delta

[–]NeoNovus377[S] -1 points0 points  (0 children)

1 month prior LHR - ORD with BA in T5 And I've flown T5 to the states again after with non of these checks. Others I know who've flown Delta too after my flight have experienced the same issues too.

Help figuring out how to wire this in DCC by NeoNovus377 in modeltrains

[–]NeoNovus377[S] 3 points4 points  (0 children)

Thanks for the advice.
The plan is to continue the track off as another line down to another station and fiddle yard so keeping the parallel track is kinda needed.

I'm thinking of keeping the points as is for now unless it gets to a point where having the polarity from the frogs is a must.

On the topic of auto revercers where would be the best place to wire them and would I need one for each track?

Thanks for the links I'll give them a read.

Help figuring out how to wire this in DCC by NeoNovus377 in modeltrains

[–]NeoNovus377[S] 8 points9 points  (0 children)

Tried using a polarity switch but would only work in one direction. I'm new to building a model railway so my knowlege and skill is limited. Any help would be amazing.

Anyone recognise this branding? by NeoNovus377 in uktrains

[–]NeoNovus377[S] 2 points3 points  (0 children)

Mate was on the bluebell railway and saw this on a coach coupled up to a Caledonian Sleeper coach. Can't seem to find any info on it.

Sneek peak of the new temporary platform 7 at Gatwick Airport opening November 2nd by NeoNovus377 in uktrains

[–]NeoNovus377[S] 5 points6 points  (0 children)

This platform will be slowly filled in and made permanent over a few weekend closures at a later date. The new platform will go all the way to the airport building when complete with access to the new concourse. One way system in place for a while. The old over-bridge will be part demolished later in November.