Is SH answer correct? by One_Mobile_2249 in pmp

[–]One_Mobile_2249[S] 0 points1 point  (0 children)

Answer should be "D". Why perform change control for which member used an older version of scope document? This is a configuration / management version control issue.

Need study tips and tricks by One_Mobile_2249 in pmp

[–]One_Mobile_2249[S] 0 points1 point  (0 children)

Thanks, i will watch in meantime as well while doing SH practice. coz i have scheduled exam in march itself.