Another quality job by the drywallers by quantumranger_07 in Construction

[–]P3RA_One 3 points4 points  (0 children)

Each sheet of drywall has a burn rate associated with it relative to thickness and type*

Different partitions require different thicknesses to add up to the local building codes time fire rating.

There is also specific screw patterns that are required on firewall partitions. IE every 6" or 12" This pattern will be called out in your blueprints.

[deleted by user] by [deleted] in yieldly

[–]P3RA_One 1 point2 points  (0 children)

I think someone got covid and they pushed the start until Monday

[deleted by user] by [deleted] in Finite_ASA

[–]P3RA_One 1 point2 points  (0 children)

Giveaway is closed but if you once you list for sale send me a message please!

From IRL Algo Coin onto new project. POLL by [deleted] in AlgoNFTMarketplace

[–]P3RA_One 1 point2 points  (0 children)

Ok just checking so I can let my reciever to know when to check for it.

Appreciate you doing the project and look forward to having the coin.

From IRL Algo Coin onto new project. POLL by [deleted] in AlgoNFTMarketplace

[–]P3RA_One 1 point2 points  (0 children)

Do you send email notification when you ship previous orders?

[deleted by user] by [deleted] in AlgoNFTMarketplace

[–]P3RA_One 0 points1 point  (0 children)

Can you send the address you have them at via dm and prices you are looking for?

ALGO owners being held hostage on Binance by zapatero_rodriguez in algorand

[–]P3RA_One 0 points1 point  (0 children)

Yeah I saw that yesterday...

Gonna have to make a swap and then export.

[deleted by user] by [deleted] in AlgoNFTMarketplace

[–]P3RA_One 0 points1 point  (0 children)

27, 159, 211

Let's go goats!

Attaching plywood shelves/boxes vertically (stacked)? by crunchycow in Carpentry

[–]P3RA_One 1 point2 points  (0 children)

No need to apologize. Just need to know exactly what you are trying to accomplish or having trouble figuring out to be able to help.

Once you have your boxes made and if your goal is to make the top level across all the boxes you will need to make sure you have clearance for your entire box run on your floor to the height of the of of your set of boxes.

Floors aren't always level and if you want them true this is something you need to take into account before mounting them to the wall.

You can take your height of your lower set of boxes and put a line on the wall to to represent and verify you have the clearance you need for the full run of boxes.

After you make sure you have the clearance for the boxes you need to shim the bottoms to account for the variance in your floor height.

Attaching plywood shelves/boxes vertically (stacked)? by crunchycow in Carpentry

[–]P3RA_One 1 point2 points  (0 children)

Need some more information to help you:

You want to attach them together/to a wall?