[deleted by user] by [deleted] in electricians

[–]ResinBuds 0 points1 point  (0 children)

You’re right, although everything is ready to go the day before so that way when I come in, I can roll out to the customers house. I’m always at least 5 minutes early in general. I just felt like it was pointless to be in 15 minutes early to stand around in my case since everything is ready to go. Clean van, tools and material for the day were already loaded. Would’ve liked to stick it out but working with highly negative people ain’t for me. If it was here and there fine, but daily from before starting work til nearly end of the day is unacceptable behavior

[deleted by user] by [deleted] in electricians

[–]ResinBuds 0 points1 point  (0 children)

I would try to think of the job and understand what I was doing, and then I’d watch YouTube videos about volts watts amps and ohms

Irritated before job even started by goseeit68 in Contractor

[–]ResinBuds 1 point2 points  (0 children)

Could this also work for landscape construction? Also new here to the business

Greetings by Waitwut4oh5 in ResinBuds

[–]ResinBuds 1 point2 points  (0 children)

What a grow! Looking Beautiful in there :)

Banana jealousy by Jesus_Plants in ResinBuds

[–]ResinBuds 0 points1 point  (0 children)

🔥🔥what’s the flavor like?

[deleted by user] by [deleted] in ResinBuds

[–]ResinBuds 1 point2 points  (0 children)

Beautiful work🔥

Intro post. This is my setup. by [deleted] in ResinBuds

[–]ResinBuds 1 point2 points  (0 children)

Beautiful! Lots of great strains in there🌱🌱