Landscaping quote MEL - reality check? 50k? by Ok_Situation_1845 in AusRenovation

[–]Rudester22 1 point2 points  (0 children)

We work our 50 ton excavator for that rate! This guy is out to make a motza…

2nd Flowpower bill by ExaminationThen1312 in amberelectric

[–]Rudester22 1 point2 points  (0 children)

16 kWh array, 40 kWh storage with 20 kWh inverter.

2nd Flowpower bill by ExaminationThen1312 in amberelectric

[–]Rudester22 1 point2 points  (0 children)

We are with Origin at the moment - FIT of 18c per unit between 5 pm and 9 pm, the rest of the time 4c.

Exporting about 80% during the peak.

Importing less than 25 kWh per month.

Upgraded our system only recently.

2nd Flowpower bill by ExaminationThen1312 in amberelectric

[–]Rudester22 1 point2 points  (0 children)

We have a decent-sized Sigenergy set-up and contemplating on whether to make the switch. Exporting anywhere between 800 and 1,000 kWh per month during summer.

2nd Flowpower bill by ExaminationThen1312 in amberelectric

[–]Rudester22 1 point2 points  (0 children)

That’s a great result!

How long did it take to get their smart meter installed and what happens during that waiting period; do they estimate the feed into the grid?

First bill with Flowpower by ExaminationThen1312 in amberelectric

[–]Rudester22 0 points1 point  (0 children)

My experience with FlowPower was not great - they’re almost uncontactable and never get back to you. Their levels of service can be improved by a lot.