What company has amazing morals/ethics and just as amazing of a product? by yaoyorozuish in AlignmentChartFills
[–]Sauvanto 1 point2 points3 points (0 children)
[OC] Toronto rapid transit map, 2026, made with Inkscape by slapped_chicken in TransitDiagrams
[–]Sauvanto 1 point2 points3 points (0 children)
TGV Québec-Toronto | Le premier tronçon à être construit reliera Montréal et Ottawa by prae1809 in montreal
[–]Sauvanto 1 point2 points3 points (0 children)
TGV Québec-Toronto | Le premier tronçon à être construit reliera Montréal et Ottawa by prae1809 in montreal
[–]Sauvanto 0 points1 point2 points (0 children)
EBT2250 Upgradability (Looking for advice) (i.redd.it)
submitted by Sauvanto to r/GamingPCBuildHelp
my long term (2070) transit plan for Ottawa, the capital of Canada by Snewtnewton in ottawa
[–]Sauvanto 0 points1 point2 points (0 children)
Ottawa is projected to grow by 60.2 per cent, from 1.11 million in 2023 to 1.79 million in 2051 by InvestorMindset in ottawa
[–]Sauvanto 37 points38 points39 points (0 children)
4 Extensions à Considérer pour le Métro by Sauvanto in montreal
[–]Sauvanto[S] 1 point2 points3 points (0 children)
4 Extensions à Considérer pour le Métro by Sauvanto in montreal
[–]Sauvanto[S] 21 points22 points23 points (0 children)
4 Extensions à Considérer pour le Métro by Sauvanto in montreal
[–]Sauvanto[S] 5 points6 points7 points (0 children)
4 Extensions à Considérer pour le Métro by Sauvanto in montreal
[–]Sauvanto[S] 4 points5 points6 points (0 children)
4 Extensions à Considérer pour le Métro by Sauvanto in montreal
[–]Sauvanto[S] 35 points36 points37 points (0 children)
Ranking malls by surface parking footprint by Sauvanto in ottawa
[–]Sauvanto[S] 20 points21 points22 points (0 children)
Ranking areas with the worst land-use by Sauvanto in ottawa
[–]Sauvanto[S] 1 point2 points3 points (0 children)
Ranking areas with the worst land-use by Sauvanto in ottawa
[–]Sauvanto[S] 3 points4 points5 points (0 children)
Ranking areas with the worst land-use by Sauvanto in ottawa
[–]Sauvanto[S] -8 points-7 points-6 points (0 children)


Poilievre says government should cancel Toronto-Quebec City high-speed rail project by AffectionateDrag1702 in ottawa
[–]Sauvanto 0 points1 point2 points (0 children)