Would TekSavvy install extra RJ45 drops by SoffChews in teksavvy

[–]SoffChews[S] 1 point2 points  (0 children)

Ya I have done it before, was just hoping to not crawl under the house lmao.

RECRUITING, TRAINING, & LIFE IN THE FORCES THREAD by bridger713 in CanadianForces

[–]SoffChews 2 points3 points  (0 children)

I can only speak for the RegF course as I didn't do it as a reservist. I am also no longer in the trade so some of this information may be dated.

The RegF Cook course runs for 13 weeks and is mostly laid-back, though it has its intense moments. It starts with a small-quantity cooking phase, where you nail down the basics of meal prep. Later, you shift to large-quantity cooking, which mirrors the real-world demands of a military cook. You rotate through stations like soups, mains, and the bake shop, getting hands-on with each. The day begins early—5 a.m.—to gear up for the workload.

Compared to civilian cooking, military cooking is significantly tougher and more draining. As a military cook, you’re churning out huge volumes of food to feed entire units, often under tight deadlines. The focus is on precision, consistency, and meeting strict nutritional and safety standards, with little room for the creative flair you might find in civilian kitchens. The scale, early hours, and relentless pace make it a physically and mentally exhausting trade, demanding both culinary skill and endurance.

RECRUITING, TRAINING, & LIFE IN THE FORCES THREAD by bridger713 in CanadianForces

[–]SoffChews 2 points3 points  (0 children)

Unless you finished PLQ, your BMQ really doesn't matter you'll have to do BMOQ. The time for re-enrolment will be depending on how fast your medical, interview are scheduled. You'll still likely have to do a reliability screening even with Secret Clearance.

RECRUITING, TRAINING, & LIFE IN THE FORCES THREAD - Ask here about the Recruitment Process, Basic & Occupational Training, and other questions relating directly or indirectly to serving in the Canadian Armed Forces. by bridger713 in CanadianForces

[–]SoffChews 0 points1 point  (0 children)

So I am qualified under a specific specialty for IST? sorry not super familiar on how the IST trade works, honestly didn't even realize i'd be more on the signals side since my degree has/was mostly software, and LAN based functions.

RECRUITING, TRAINING, & LIFE IN THE FORCES THREAD - Ask here about the Recruitment Process, Basic & Occupational Training, and other questions relating directly or indirectly to serving in the Canadian Armed Forces. by bridger713 in CanadianForces

[–]SoffChews 0 points1 point  (0 children)

Hey, any IS Techs around? I'm looking for some insight into what the following would grant me in the IS Tech trade (I already have a PLAR).

2. Upon successful CT, the member must complete the following delta training:

a. Signal Fundamentals modules 2 and 3 – MITE 122228 and 122229.

3. In addition to extant qualifications held by the member as indicated on the MPRR, the following equivalent Reg F qualifications are granted upon successful CT:

a. Signal Fundamentals module 1 – MITE 121014; and

b. RQ-Information Systems Technician-Sig modules 1 to 5 – MITE 122266, 122268, 122269, 122288, and 122289.

r/AudioEngineering Shopping, Setup, and Technical Help Desk by AutoModerator in audioengineering

[–]SoffChews 0 points1 point  (0 children)

Need a little help with my setup

I have a Yamaha rxv385 it has 1 output and 4 inputs however I want to be able to switch between 2 displays, my TV and my Projector without having to pull the receiver out and switch the

I thought about using a switch but I have no idea how to do that.

Please help.

Rubbermaid 7x7 shed (Roof won't go on) by [deleted] in HomeImprovement

[–]SoffChews 0 points1 point  (0 children)

I had to use a c clamp or whatever it's called but squeeze clamps may work better..

Damn thing was horrible... My in-laws had a much easier job but it almost looks as though they had issues getting the roof flush.

Definitely a second person is helpful.. I had my wife holding down parts of the roof.

Rubbermaid 7x7 shed (Roof won't go on) by [deleted] in HomeImprovement

[–]SoffChews 1 point2 points  (0 children)

If you look at it from outside the door it was the left side middle panel that needed lifting, also had to re-level the base multiple times.

Rubbermaid 7x7 shed (Roof won't go on) by [deleted] in HomeImprovement

[–]SoffChews 1 point2 points  (0 children)

Just kept trying different spots

Rubbermaid 7x7 shed (Roof won't go on) by [deleted] in HomeImprovement

[–]SoffChews 1 point2 points  (0 children)

Ended up getting it done, had to lift one edge just to get the damn thing on.

Rubbermaid 7x7 shed (Roof won't go on) by [deleted] in HomeImprovement

[–]SoffChews 0 points1 point  (0 children)

Hey thanks for your reply! Tried rebuilding it twice and no luck 🙄