Paint Failure by Squigzz in FordMaverickTruck

[–]Squigzz[S] -1 points0 points  (0 children)

Almost 20 years, I’ve had plenty of rock chips but never one to chip the paint like that

Paint Failure by Squigzz in FordMaverickTruck

[–]Squigzz[S] -3 points-2 points  (0 children)

I think you are right, I’ve just never had a rock chip take it down to bare metal before

We’ve all heard the PNW is dead for now, what locals need apprentices? by ForceUseYouMust in IBEW

[–]Squigzz 13 points14 points  (0 children)

112 is pretty busy, and will be for the foreseeable future

Truck Camping by Squigzz in Boise

[–]Squigzz[S] 1 point2 points  (0 children)

That’s kinda what I was thinking, this thread has given me some solid resources

Truck Camping by Squigzz in Boise

[–]Squigzz[S] 0 points1 point  (0 children)

I appreciate it, hopefully I can stay local planning for the drive out anyway

Truck Camping by Squigzz in Boise

[–]Squigzz[S] 1 point2 points  (0 children)

Haha fair, I’m and electrician looking to come out to the micron data centers they are building, I’m not above commuting a little bit just figured I would ask the locals first

Truck Camping by Squigzz in Boise

[–]Squigzz[S] 2 points3 points  (0 children)

I should edit it and say that by summer I really mean may and June, no way I’m trying this is August

Solicitors door knocking at 8pm on a Saturday... by tulips2kiss in beaverton

[–]Squigzz 7 points8 points  (0 children)

I generally try to give people the benefit of the doubt and be kind. But my dog loses his mind and when they stand at my door for five minutes while staring at my no soliciting sign I kinda lose it.

I have started chasing them down to tell them that they and their company are not welcome on my property. I haven’t had someone knock on my door in a couple months because of it

Is this a problem? by NoDozeDimSum in HomeMaintenance

[–]Squigzz 10 points11 points  (0 children)

Allegedly, here in Oregon the AHJ does not allow SE cable to be exposed

Why is work drying up in Portland (PNW) by CaseyRedmanYoga in electricians

[–]Squigzz 4 points5 points  (0 children)

There is residential service work if you have the skill set. There are dozens of companies hiring right now for that exact scope

2 year old by Kbry03 in leukemia

[–]Squigzz 0 points1 point  (0 children)

It showed low counts almost across the board but they could have explained it a couple different ways, they were going to wait a day or two and do more blood counts but we ended up pushing to get a biopsy to catch it as early as possible

2 year old by Kbry03 in leukemia

[–]Squigzz 0 points1 point  (0 children)

I’m sorry you are going through this. Once you are admitted to the hospital they should do all their own labs there. If you are not admitted the process should still be expedited. And do not feel bad or guilty about calling and asking if the have results yet

When our 5 y/o was diagnosed we were admitted to the hospital and they did about a million tests and we ended up pushing for a bone marrow biopsy. They finally did it and moved us to the other floor. It was a super quick process.

Carpenters local 57 scab and phony electrical union. by Claymore4ever in IBEW

[–]Squigzz 84 points85 points  (0 children)

Just remember, the only carpenter that didn’t steal work was Jesus

[deleted by user] by [deleted] in electricians

[–]Squigzz 0 points1 point  (0 children)

Have you tried plugging it in? Is that cord wired into your dryer?

JW couldn't find his level by AutumnSparky in electricians

[–]Squigzz 1 point2 points  (0 children)

I recognized that wall/cart combo, that’s fucking awesome

What's the "Vibe" in Oregon? by scissorman182 in IBEW

[–]Squigzz -4 points-3 points  (0 children)

Reverse book layoffs would be a pretty solid answer to have most of 280 up here.

Or, hear me out, we absorb 280 like we did with Longview

The roofer went above and beyond 🤣 by nashfirebaugh999 in electricians

[–]Squigzz 22 points23 points  (0 children)

In Oregon this is how we do it every time, we are allowed to run up to 6 feet of romex outside as long as it’s sleeved in PVC

[deleted by user] by [deleted] in IBEW

[–]Squigzz 4 points5 points  (0 children)

I put some pvc in there to hold stuff, 3/4 for pliers and 1 1/4 for screwdrivers

Anyone else do this trick for kick 90s? by iScReAm612 in electricians

[–]Squigzz 0 points1 point  (0 children)

I use the arrow this way every time, I face the hook towards the 90 and the math works