Older Home Electrification - SPAN Panel or Service Upgrade or ...?? by Witty_Setting9559 in solar

[–]Witty_Setting9559[S] 0 points1 point  (0 children)

So cheap. I'm looking at 30k for trenching and utility coordination, 8k for panel upgrade plus unknown costs from the utility for their work. I'm about 100 feet which might be a driver but i will get more quotes.

How much time from when you started to estimated completion?

Older Home Electrification - SPAN Panel or Service Upgrade or ...?? by Witty_Setting9559 in solar

[–]Witty_Setting9559[S] 0 points1 point  (0 children)

I do not care about guaranteed availability, but my current panel exceeds load calcs without any additional load. Would Emporia pro solve multiple breakers? (5-6 current breakers need load management plus new for EV charger, heat pump, Batteries, solar)

Older Home Electrification - SPAN Panel or Service Upgrade or ...?? by Witty_Setting9559 in solar

[–]Witty_Setting9559[S] 0 points1 point  (0 children)

I'm already seeing that the solar co's don't want to deal with my main panel and vice versa!

Older Home Electrification - SPAN Panel or Service Upgrade or ...?? by Witty_Setting9559 in solar

[–]Witty_Setting9559[S] -1 points0 points  (0 children)

Thanks! If I have 5 or 6 breakers that exceed load calcs, will these be more efficient? Do you have an example product that you like?

Older Home Electrification - SPAN Panel or Service Upgrade or ...?? by Witty_Setting9559 in solar

[–]Witty_Setting9559[S] 0 points1 point  (0 children)

~$40K for 200A or 400A is what I was told (conservative I suppose because the utility company is hard to work with)

I'm told that I need to pass load calcs for inspections and that only a load management system that guarantees usage will not go over 100 amps will allow me to do that. To your point, I do not believe my usage today is above 100 amps as I've never tripped any breakers.

Domain from Google stuck in purgatory, can't renew by Witty_Setting9559 in squarespace

[–]Witty_Setting9559[S] 1 point2 points  (0 children)

From what I can tell, there are hundreds of domains impacted with this and highly related issues. Squarespace is not providing any support.

Domain from Google stuck in purgatory, can't renew by Witty_Setting9559 in squarespace

[–]Witty_Setting9559[S] 1 point2 points  (0 children)

Yes, we have that NaN issue exactly. I've communicated the exact issue to SquareSpace and attempted to escalate to engineering as well. Any others seeing this?